Files
waggle-os/docs/handoffs/2026-05-02-day-0-readiness-checklist.md
Oleg Maslov 0c3e2ead3b
Some checks failed
Installer Smoke / installer-smoke (push) Has been cancelled
moving
2026-09-02 10:10:29 +02:00

5.1 KiB

Day 0 Readiness Checklist — 2026-05-02 Jutro

Datum: 2026-05-02 jutro CET Status: Sprint Day +2 od pre-launch konsolidacionog memo (2026-04-30) ETA Day 0: 6-10 dana (8-12. maj prozor) Cilj ovog dokumenta: vidljivost svih 9 paralelnih track-ova + jasna preporuka šta ide sledeće danas


9 paralelnih track-ova — status

Track Naziv Status Action owner ETA
A apps/web (Workspace OS) 🟢 SHIPPING-READY done (Pass 7 + Block C)
B hive-mind monorepo OSS 🟡 Push gate parkiran do Day 0 minus 1 MARKO 30-60 min Day 0 prep
C Gaia2 ARE Post-launch deferred not v1
D Landing v3.2 → apps/www port 🟡 §1+§2 done (commit c4b0c04), §3 i18n+Stripe+Lighthouse u toku CC + PM standby ~60-90 min remaining
E Arxiv preprint 🟢 7-decision RATIFIED CLOSED 2026-05-02; A+D path locked; drafting can start, ne blokira Day 0 MARKO sutra Pavlukhin EVOLVESCHEMA + PM drafting 7-9 dana drafting + 5-6 dana endorsement (Path A)
F UI/UX Pass 1+2 🟢 Done done
G E2E persona scripte 🟡 Scripte ready, kreće posle apps/www live PM (post-D) tbd
H Hermes intel canonical doc 🟢 CLOSED 2026-05-02 sa 6 surgical edits u canonical doc done
I Stripe + legal pages 🟡 Stripe sutra ponedeljak (finance ekipa), legal Marko-side TBD MARKO ponedeljak+ varies
NEW Methodology markdown doc (Path D Trust Band swap target) 🟡 Mora biti live u OSS repo pre Day 0 PM 30-45 min draft

Legenda: 🟢 done · 🟡 in-flight ili pending · 🔴 blocked · deferred


Šta je smart paralelno DANAS (dok CC u Sesija D)

Marko-side action queue (može odmah, ne čeka mene)

  1. Track B push gate (5 min) — cd D:\Projects\waggle-os && git push. To ti je urađeno za apps/www port, ali subtree split scripts za hive-mind OSS mogu se izvršiti paralelno. Plus PR #1 (sibling sync hook) za merge u hive-mind. Non-blocking ali bolje da zatvorimo pre Day 0 checkliste.

  2. Track I Stripe keys (15-30 min) — paste real Stripe live keys u Vercel env (ili wherever production env lands). CC u Sesija D koduje internal /api/stripe/checkout sa placeholders; tvoja akcija je da prebaci pk_test_REPLACE_ME → pk_live_xxx + sk_test_REPLACE_ME → sk_live_xxx pre nego što landing ide live.

  3. Track I legal pages (1-2h) — privacy.md, terms.md, cookies.md, EU AI Act statement. Mogu biti templated iz Egzakta Group postojećih advisorska legal materijala. CC pravi /app/(legal)/ folder strukturu u Sesija D, ali content stringovi su Marko-side (jurisdikcija + Egzakta entity references).

PM-side queue (ja vodim solo dok CC radi)

  1. Track H Hermes intel integration (30-45 min) — autorajem update postojećeg canonical competitive doc-a sa Hermes findings. Tightens competitive moat narrative pre Day 0. Cilj: Hermes findings live u canonical reference koji se koristi za KVARK pitch + arxiv §6 + landing trust signals.

  2. Memory entry consolidation (15 min) — MEMORY.md indeks sad raste, treba pruning + reorganizacija po prioritetu. Cleanup batch zadatak.

Interactive queue (treba Marko bandwidth)

  1. Track E arxiv 7-decision ratification (30-45 min) — slično kao landing v3.2 sesija danas, ja izvučem 7 decisions iz arxiv skeleton, ti ratifikuješ jednu po jednu, output je v1 ratified arxiv outline spreman za section-by-section drafting. Pre-launch dependent (arxiv preprint link je u Trust Band card u landing-u).

  2. Memory live test sesija (60-90 min) — skripta iz overnight 2026-04-30 spremna, čeka tvoj slot. Output je session report koji postaje §0 evidence base za Wave 1.5 brief.

  3. Wave 1.5 Memory Architecture Fix brief (45-60 min) — može doći posle memory live test, ja autorajem brief za P0+P1 memory architecture audit gaps. Gate za clean memory story Day 0.


Moja preporuka za sledeći potez

Tri stvari u paraleli (ti + ja, dok CC dovršava §1-§4 apps/www port):

  1. Marko: kreni Track I Stripe keys (15 min) i Track B push gate (5 min) odmah. To je ~20 min Marko-side rada, niko te ne blokira, neutralizuje 2 launch-blocking stavke.

  2. PM (ja): krećem Track H Hermes intel integration (30-45 min) odmah. Ne treba tvoja bandwidth, izvedem self-contained, output je gotov updated competitive doc.

  3. Posle ~30-45 min — sastajemo se za Track E arxiv 7-decision ratifikaciju (30-45 min interactive). Do tog momenta CC će biti negde u §2 component port (50-70% kroz total). Ti vidiš CC progress notif paralelno.

Posle arxiv ratifikacije (~12:00-13:00 ako krećemo sad oko 9-10 ujutro), zavisno od CC stage:

  • Ako CC završio Sesija D → krećemo PM Pass 8 + memory live test slot
  • Ako CC još u toku → memory live test može da krene, Pass 8 sutra ujutro

Ne sad: Track G E2E persona scripte (čeka apps/www live), Wave 1.5 Memory brief (čeka memory live test findings), Track C Gaia2 (post-launch).


Pitanje za tebe: krećemo paralelno (ti Stripe+push, ja Hermes intel)? Ili predlažeš drugačiji order?