88 lines
6.2 KiB
Markdown
88 lines
6.2 KiB
Markdown
# End-of-Day Handoff — Marko Sutra Ujutro 2026-05-02
|
|
|
|
**Datum:** 2026-05-01 kasno noć (03:11 CET kad CC zatvorio Block C, ti otišao spavanje malo posle)
|
|
**Za:** Marka, jutarnja sesija 2. maj
|
|
**Status:** apps/web shipping-ready; landing v3.2 next critical path; sve ostalo parked
|
|
|
|
---
|
|
|
|
## §0 — TL;DR
|
|
|
|
Apps/web layer je production-ready. Pass 7 PASS, Block C state restore done, production backend live sa WAGGLE_PROMPT_ASSEMBLER=1, /health 200, frameCount 9 production data. CC standing down. Sutra otvaramo landing v3.2 sesiju zajedno — to je sledeći critical-path item pre Day 0 launch (ETA još 7-11 dana).
|
|
|
|
Nema P0 nerešenih stvari. 3 P2/P3 friction notes deferred u Day-2 backlog (kosmetika + edge case Replay tour fix). Sve čeka tebe ujutro za pokretanje landing v3.2 sesije.
|
|
|
|
---
|
|
|
|
## §1 — Šta se desilo danas (sažeto)
|
|
|
|
Dan je bio Block A friction batch (25 frikcija iz Pass 1-6 zatvorenih) → Block B Phase 1 addiction features (Tour Replay + Imports Reminder shipped) → Block B Day-2 backlog autoring → Pass 7 verifikacija (9/9 PASS) → Block C state restore.
|
|
|
|
Glavni breakthrough nije bio code, nego: **wizard ima 8 koraka stvarno (kao što si rekao)** — moja prethodna PM mapa od 4 surface-a bila je posledica auto-complete branch-a u `useOnboarding.ts:77-106` koji bypassuje wizard kad postoje workspaces. Investigation dokumentovana u `docs/ONBOARDING-INVESTIGATION-2026-04-30.md`. Sa `?forceWizard=true` URL paramom (dev-gated) verifikovali smo svih 8 koraka renderuju clean, transparent crna pozadina, FR#33 round 3 finally klin.
|
|
|
|
PromptAssembler v5 (GEPA Faza 1 +12.5pp) **wired in production** kroz commit d619542 — prethodno je ostao u eval env-u, sada je live u backend chat + spawn paths. To znači da launch claim "+12.5pp Claude smarter" nije više samo eval rezultat nego production-validated.
|
|
|
|
Spend ovaj round: **~$0** (Block A/B/C su pure code + docs + routine, nije bilo LLM evaluacija).
|
|
|
|
---
|
|
|
|
## §2 — Stanje ka launch-u
|
|
|
|
| Track | Status | Akcija |
|
|
|-------|--------|--------|
|
|
| A — apps/web | SHIPPING-READY | Done, deferred FR Pass7-A/B/C u Day-2 |
|
|
| B — hive-mind monorepo | Push gate na tvojoj strani | 4 gh komande + PR #1 merge — non-blocking |
|
|
| C — Gaia2 | Post-launch deferred | — |
|
|
| D — Landing v3.2 | NEXT CRITICAL | **Sutra ujutro sa Markom** |
|
|
| E — Arxiv | Skeleton ready | Čeka tvoju 7-decision ratifikaciju |
|
|
| F — UI/UX Pass 2 | Done | — |
|
|
| G — E2E persona | Scripte ready | Kreće posle landing v3.2 + apps/www live |
|
|
| H — Hermes intel | Entry written | Integration u canonical doc pending |
|
|
| I — Stripe/Legal | Tvoja strana | Paralelno |
|
|
|
|
ETA Day 0 launch: **7-11 dana** (8-12 dana po prethodnom konsolidacionom memo-u, minus 1 jer je Wave 1 substantively done).
|
|
|
|
---
|
|
|
|
## §3 — Šta TI radiš ujutro (po prioritetu)
|
|
|
|
**Prvo — landing v3.2 sesija sa mnom (30-45 min).** Ja predlažem 3-koračni plan koji sam ti dao u poslednjem odgovoru pre nego što si rekao spavanje:
|
|
|
|
1. Korak 1 (5 min): Otvorim Claude Design `Waggle Landing.html` u Chrome MCP, snapshot trenutne copy across svih 8 sekcija.
|
|
2. Korak 2 (10 min): Side-by-side sa v3.1 markdown spec-om (`strategy/landing/2026-04-30-landing-v3.1-refreshed-overnight.md`), filter 10 ratification decisions na primenjene vs open.
|
|
3. Korak 3 (15 min): Authoring v3.2 delta brief — current state vs proposed change po sekciji, sa 3 utiska iz Pass 7 integrisana (Memory app 17 platforms = "all your AI on one place" valid claim, Tour Replay + Imports Reminder = continuity-by-design copy line, wizard-renders-alone = macOS-grade onboarding moment), plus prioritization must-change vs nice-to-have.
|
|
|
|
Output je ratificirani v3.2 delta brief spreman za CC apps/www Next.js port kickoff.
|
|
|
|
**Drugo — slot za živi memory test (5 min odluka).** Skripta i dalje stoji u `strategy/e2e-testing/2026-04-30-night-memory-live-test-script-draft.md` §5. Imaš 4 ponuđena slota (1, 2, ili 3. maj AM/PM) — danas je već prošao 1. maj noćna polovina, pa biraj između preostala 3 slota. To je gate za Wave 1.5 brief koji je gate za clean memory story Day 0.
|
|
|
|
**Treće — odluči o Block B push gate (10 min).** Pre Day 0 moraš: (a) izvršiti 4 gh komande za hive-mind subtree-split push, (b) merge-ovati PR #1 (sibling sync hook). Non-blocking dok ne stignemo do landing live, ali bolje da ih završimo pre kraja nedelje da CC ima clean monorepo state za apps/www port.
|
|
|
|
---
|
|
|
|
## §4 — Šta NISAM uradio dok si spavao
|
|
|
|
Pošto si rekao spavanje pre nego što smo počeli landing v3.2 sesiju, ja **NISAM autonomno krenuo** da otvaram Claude Design ili da pišem v3.2 delta brief. Razlozi:
|
|
|
|
Prvi — landing copy je tvoja strateška odluka, ne PM execution task. Treba mi tvoj direktan input na svaku od 10 ratification decisions, a not noćni jednostrani draft koji ti ujutro mora da prevartiš.
|
|
|
|
Drugi — 3 utiska iz Pass 7 (Memory 17 platforms, addiction features, wizard alone) trebaju tvoj sign-off pre integracije, jer "collector positioning" i "continuity-by-design" su brand-level pomaci koji utiču i na arxiv i na KVARK pitch dalje.
|
|
|
|
Treći — Hermes intel integration u canonical competitive doc je takođe parked, isti razlog kao prošle noći (treba ići zajedno sa landing finalize-om kroz tvoj review da framing bude konzistentan).
|
|
|
|
CC je primio uputstvo da napiše svoj session handoff u waggle-os repo (`docs/sessions/2026-05-01-S1-handoff.md`) — to je njihov audit trail, paralelan sa ovim. Ako ti zatreba njihov side, tamo je.
|
|
|
|
---
|
|
|
|
## §5 — Sources
|
|
|
|
- [PM Pass 7 + Block C memory entry](computer://C:\Users\MarkoMarkovic\AppData\Roaming\Claude\local-agent-mode-sessions\e2d5241a-93ad-452a-9146-f5ad0c7cf5fd\ffbb9f0b-ff93-4868-b621-0772605ae5e9\spaces\3f2d6e44-70b5-4df1-a6bd-2dedc376f48f\memory\project_pass7_block_c_closed_2026_05_01.md)
|
|
- [Friction log §99 Pass 7 update](computer://D:\Projects\PM-Waggle-OS\strategy\e2e-testing\2026-05-01-friction-log.md)
|
|
- [Landing v3.1 markdown spec](computer://D:\Projects\PM-Waggle-OS\strategy\landing\2026-04-30-landing-v3.1-refreshed-overnight.md)
|
|
- [Memory live test script](computer://D:\Projects\PM-Waggle-OS\strategy\e2e-testing\2026-04-30-night-memory-live-test-script-draft.md)
|
|
- [This handoff](computer://D:\Projects\PM-Waggle-OS\handoffs\2026-05-01-end-of-day-handoff.md)
|
|
|
|
---
|
|
|
|
**Lepo spavanje. Vidimo se ujutro za landing v3.2.**
|