Files
waggle-os/docs/handoffs/2026-05-01-end-of-day-handoff.md
Oleg Maslov 0c3e2ead3b
Some checks failed
Installer Smoke / installer-smoke (push) Has been cancelled
moving
2026-09-02 10:10:29 +02:00

6.2 KiB

End-of-Day Handoff — Marko Sutra Ujutro 2026-05-02

Datum: 2026-05-01 kasno noć (03:11 CET kad CC zatvorio Block C, ti otišao spavanje malo posle) Za: Marka, jutarnja sesija 2. maj Status: apps/web shipping-ready; landing v3.2 next critical path; sve ostalo parked


§0 — TL;DR

Apps/web layer je production-ready. Pass 7 PASS, Block C state restore done, production backend live sa WAGGLE_PROMPT_ASSEMBLER=1, /health 200, frameCount 9 production data. CC standing down. Sutra otvaramo landing v3.2 sesiju zajedno — to je sledeći critical-path item pre Day 0 launch (ETA još 7-11 dana).

Nema P0 nerešenih stvari. 3 P2/P3 friction notes deferred u Day-2 backlog (kosmetika + edge case Replay tour fix). Sve čeka tebe ujutro za pokretanje landing v3.2 sesije.


§1 — Šta se desilo danas (sažeto)

Dan je bio Block A friction batch (25 frikcija iz Pass 1-6 zatvorenih) → Block B Phase 1 addiction features (Tour Replay + Imports Reminder shipped) → Block B Day-2 backlog autoring → Pass 7 verifikacija (9/9 PASS) → Block C state restore.

Glavni breakthrough nije bio code, nego: wizard ima 8 koraka stvarno (kao što si rekao) — moja prethodna PM mapa od 4 surface-a bila je posledica auto-complete branch-a u useOnboarding.ts:77-106 koji bypassuje wizard kad postoje workspaces. Investigation dokumentovana u docs/ONBOARDING-INVESTIGATION-2026-04-30.md. Sa ?forceWizard=true URL paramom (dev-gated) verifikovali smo svih 8 koraka renderuju clean, transparent crna pozadina, FR#33 round 3 finally klin.

PromptAssembler v5 (GEPA Faza 1 +12.5pp) wired in production kroz commit d619542 — prethodno je ostao u eval env-u, sada je live u backend chat + spawn paths. To znači da launch claim "+12.5pp Claude smarter" nije više samo eval rezultat nego production-validated.

Spend ovaj round: ~$0 (Block A/B/C su pure code + docs + routine, nije bilo LLM evaluacija).


§2 — Stanje ka launch-u

Track Status Akcija
A — apps/web SHIPPING-READY Done, deferred FR Pass7-A/B/C u Day-2
B — hive-mind monorepo Push gate na tvojoj strani 4 gh komande + PR #1 merge — non-blocking
C — Gaia2 Post-launch deferred
D — Landing v3.2 NEXT CRITICAL Sutra ujutro sa Markom
E — Arxiv Skeleton ready Čeka tvoju 7-decision ratifikaciju
F — UI/UX Pass 2 Done
G — E2E persona Scripte ready Kreće posle landing v3.2 + apps/www live
H — Hermes intel Entry written Integration u canonical doc pending
I — Stripe/Legal Tvoja strana Paralelno

ETA Day 0 launch: 7-11 dana (8-12 dana po prethodnom konsolidacionom memo-u, minus 1 jer je Wave 1 substantively done).


§3 — Šta TI radiš ujutro (po prioritetu)

Prvo — landing v3.2 sesija sa mnom (30-45 min). Ja predlažem 3-koračni plan koji sam ti dao u poslednjem odgovoru pre nego što si rekao spavanje:

  1. Korak 1 (5 min): Otvorim Claude Design Waggle Landing.html u Chrome MCP, snapshot trenutne copy across svih 8 sekcija.
  2. Korak 2 (10 min): Side-by-side sa v3.1 markdown spec-om (strategy/landing/2026-04-30-landing-v3.1-refreshed-overnight.md), filter 10 ratification decisions na primenjene vs open.
  3. Korak 3 (15 min): Authoring v3.2 delta brief — current state vs proposed change po sekciji, sa 3 utiska iz Pass 7 integrisana (Memory app 17 platforms = "all your AI on one place" valid claim, Tour Replay + Imports Reminder = continuity-by-design copy line, wizard-renders-alone = macOS-grade onboarding moment), plus prioritization must-change vs nice-to-have.

Output je ratificirani v3.2 delta brief spreman za CC apps/www Next.js port kickoff.

Drugo — slot za živi memory test (5 min odluka). Skripta i dalje stoji u strategy/e2e-testing/2026-04-30-night-memory-live-test-script-draft.md §5. Imaš 4 ponuđena slota (1, 2, ili 3. maj AM/PM) — danas je već prošao 1. maj noćna polovina, pa biraj između preostala 3 slota. To je gate za Wave 1.5 brief koji je gate za clean memory story Day 0.

Treće — odluči o Block B push gate (10 min). Pre Day 0 moraš: (a) izvršiti 4 gh komande za hive-mind subtree-split push, (b) merge-ovati PR #1 (sibling sync hook). Non-blocking dok ne stignemo do landing live, ali bolje da ih završimo pre kraja nedelje da CC ima clean monorepo state za apps/www port.


§4 — Šta NISAM uradio dok si spavao

Pošto si rekao spavanje pre nego što smo počeli landing v3.2 sesiju, ja NISAM autonomno krenuo da otvaram Claude Design ili da pišem v3.2 delta brief. Razlozi:

Prvi — landing copy je tvoja strateška odluka, ne PM execution task. Treba mi tvoj direktan input na svaku od 10 ratification decisions, a not noćni jednostrani draft koji ti ujutro mora da prevartiš.

Drugi — 3 utiska iz Pass 7 (Memory 17 platforms, addiction features, wizard alone) trebaju tvoj sign-off pre integracije, jer "collector positioning" i "continuity-by-design" su brand-level pomaci koji utiču i na arxiv i na KVARK pitch dalje.

Treći — Hermes intel integration u canonical competitive doc je takođe parked, isti razlog kao prošle noći (treba ići zajedno sa landing finalize-om kroz tvoj review da framing bude konzistentan).

CC je primio uputstvo da napiše svoj session handoff u waggle-os repo (docs/sessions/2026-05-01-S1-handoff.md) — to je njihov audit trail, paralelan sa ovim. Ako ti zatreba njihov side, tamo je.


§5 — Sources

  • PM Pass 7 + Block C memory entry
  • Friction log §99 Pass 7 update
  • Landing v3.1 markdown spec
  • Memory live test script
  • This handoff

Lepo spavanje. Vidimo se ujutro za landing v3.2.