Files
waggle-os/docs/decisions/2026-04-30-wave-1-5-brief-queued-behind-live-test.md
Oleg Maslov 0c3e2ead3b
Some checks failed
Installer Smoke / installer-smoke (push) Has been cancelled
moving
2026-09-02 10:10:29 +02:00

74 lines
4.4 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# LOCKED — Wave 1.5 Memory Architecture Fix Brief — QUEUED iza Live Test sesije
**Datum:** 2026-04-30
**Autor:** PM
**Status:** LOCKED ("stavi u red, prvo testirmo pa onda dalje")
**Cross-reference:** `feedback_memory_systems_coexistence.md` + `D:\Projects\memory-architecture-audit-2026-04-29.md` (audit sa 10 gap-ova G1-G10)
---
## Odluka
Wave 1.5 brief authoring se **ne pokreće** dok PM i Marko ne završe dedicated live test sesiju (ili više njih) na Marko-ovoj mašini, gde verifikujemo:
1. **Coexistence verifikaciju:** Claude Code MEMORY.md fajl-bazirana memorija + hive-mind sqlite memorija rade paralelno bez konflikta tokom live CC sesije
2. **Mirror hook bridge mehanizam:** hash-file portability između dva sistema radi clean preko Win32 platforme; bez race conditions, bez tihih fail-ova
3. **G1-G10 audit gap-ovi u praksi:** koji su replicable na Marko-ovoj mašini, koji su artifact prethodne sesije, koji su edge cases koji se ne pojavljuju u standard workflow-u
4. **Workflow patterns u Claude Code-u:** kako Marko realno koristi MEMORY.md vs hive-mind kroz dan, šta zaista live u kojoj memoriji i kada
Na osnovu real findings sa live test sesije, Wave 1.5 brief se autorize-uje sa eksplicitnim §0 gate koji referencira live test session report (datum + nalaz po nalazu).
---
## Razlog
Pre-launch stakovi su previsoki da bi se Wave 1.5 P0 brief autorizovao "sa CC strane" bez verifikovane osnovice. Audit dokument (G1-G10) je tvoj observation-based snimak — ali audit je iz 2026-04-29, bridge mehanizam se evoluirao kroz CC Sesija B Wave 1 cleanup (627-line bundled hook asset, postinstall.cjs fix, hive-mind-cli doctor smoke), pa je deo gap-ova možda već uklonjen u međuvremenu. Drugo, scope coexistence constraint (LOCKED 2026-04-30) menja kako se neki od gap-ova adresiraju — npr. G7 hash-file portability je sad load-bearing, što u original audit dokumentu nije bio prioritet.
Bolja sekvenca je: (a) live test session nam daje verified gap inventory + verifikovanu workflow taksonomiju + verifikovani coexistence patterns; (b) tek onda Wave 1.5 brief sa real evidence i jasnim definition-of-done; (c) CC kickoff sa §0 gate koji blokira ako brief ne odražava live findings.
---
## Šta NE radimo dok ne završimo live test
- Ne autorize-uje Wave 1.5 brief
- Ne pokreće CC stream za hive-mind side memory polish
- Ne menja Track G persona scripte u smeru memory walkthrough (čeka real workflow patterns)
- Ne lock-uje arxiv §5.4 dogfood paragraf koji opisuje memory layer (čeka workflow validaciju)
- Ne lock-uje KVARK pitch slide o memory differentiator-u (čeka workflow validaciju)
---
## Šta radi paralelno (ne blokirano live testom)
- CC A integration sprint priprema (kad bude trigger, post Wave 1.5)
- Track A UI/UX Pass 2 review na updated Claude Design prototype (čim Marko ratifikuje fix preporuke iz Pass 1)
- arxiv §1-§3 + §5.1-§5.3 + §6-§10 finalize (memory dogfood §5.4 ostaje placeholder)
- Landing v3 finalize (proof card 1 ima Faza 1 brojeve, ne traži memory dogfood data)
- Stripe products + Egzakta legal kickoff (Marko-side)
- Hermes intel integration u canonical competitive doc
---
## Live test sesija — operativni format (PM predlog)
**Trajanje:** 60-90 min PM + Marko, sinhrono na Marko-ovoj mašini kroz Computer Use ili screen-share equivalent
**Preduslovi:** clean Claude Code sesija + hive-mind installed sa najsvežijom Wave 1 cleanup verzijom (CC B branch a10867c ili merged main posle integration sprint)
**Skripta:** PM autoring dan pre sesije, 8-10 koraka koji systematic-ally prolaze kroz svih 10 audit gap-ova + coexistence patterns + tipičan dnevni workflow (3-4 tasks)
**Output:** session report sa tabelom (G# × replicable yes/no/partial × notes) + workflow log + screenshot capture × kritični trenuci + Wave 1.5 P0 / P1 / P2 razrešenje na bazi findings
**Predlog za zakazivanje:** Marko bira slot u sledećih 48-72h (1-3 svibnja). PM priprema skriptu 24h pre slot-a.
---
## Audit trail anchors
- Coexistence LOCK: `feedback_memory_systems_coexistence.md`
- Audit dokument source: `D:\Projects\memory-architecture-audit-2026-04-29.md`
- CC B closure: `project_cc_sesija_b_closed_2026_04_30.md` (Wave 1 cleanup u §2.4)
- Pre-launch sprint context: `decisions/2026-04-30-pre-launch-sprint-consolidation-LOCKED.md`
- This decision: `decisions/2026-04-30-wave-1-5-brief-queued-behind-live-test.md`
---
**End of decision. Wave 1.5 brief on hold pending live test slot Marko ratifikacija.**