Files
waggle-os/docs/decisions/2026-04-30-wave-1-5-brief-queued-behind-live-test.md
Oleg Maslov 0c3e2ead3b
Some checks failed
Installer Smoke / installer-smoke (push) Has been cancelled
moving
2026-09-02 10:10:29 +02:00

4.4 KiB
Raw Permalink Blame History

LOCKED — Wave 1.5 Memory Architecture Fix Brief — QUEUED iza Live Test sesije

Datum: 2026-04-30 Autor: PM Status: LOCKED ("stavi u red, prvo testirmo pa onda dalje") Cross-reference: feedback_memory_systems_coexistence.md + D:\Projects\memory-architecture-audit-2026-04-29.md (audit sa 10 gap-ova G1-G10)


Odluka

Wave 1.5 brief authoring se ne pokreće dok PM i Marko ne završe dedicated live test sesiju (ili više njih) na Marko-ovoj mašini, gde verifikujemo:

  1. Coexistence verifikaciju: Claude Code MEMORY.md fajl-bazirana memorija + hive-mind sqlite memorija rade paralelno bez konflikta tokom live CC sesije
  2. Mirror hook bridge mehanizam: hash-file portability između dva sistema radi clean preko Win32 platforme; bez race conditions, bez tihih fail-ova
  3. G1-G10 audit gap-ovi u praksi: koji su replicable na Marko-ovoj mašini, koji su artifact prethodne sesije, koji su edge cases koji se ne pojavljuju u standard workflow-u
  4. Workflow patterns u Claude Code-u: kako Marko realno koristi MEMORY.md vs hive-mind kroz dan, šta zaista live u kojoj memoriji i kada

Na osnovu real findings sa live test sesije, Wave 1.5 brief se autorize-uje sa eksplicitnim §0 gate koji referencira live test session report (datum + nalaz po nalazu).


Razlog

Pre-launch stakovi su previsoki da bi se Wave 1.5 P0 brief autorizovao "sa CC strane" bez verifikovane osnovice. Audit dokument (G1-G10) je tvoj observation-based snimak — ali audit je iz 2026-04-29, bridge mehanizam se evoluirao kroz CC Sesija B Wave 1 cleanup (627-line bundled hook asset, postinstall.cjs fix, hive-mind-cli doctor smoke), pa je deo gap-ova možda već uklonjen u međuvremenu. Drugo, scope coexistence constraint (LOCKED 2026-04-30) menja kako se neki od gap-ova adresiraju — npr. G7 hash-file portability je sad load-bearing, što u original audit dokumentu nije bio prioritet.

Bolja sekvenca je: (a) live test session nam daje verified gap inventory + verifikovanu workflow taksonomiju + verifikovani coexistence patterns; (b) tek onda Wave 1.5 brief sa real evidence i jasnim definition-of-done; (c) CC kickoff sa §0 gate koji blokira ako brief ne odražava live findings.


Šta NE radimo dok ne završimo live test

  • Ne autorize-uje Wave 1.5 brief
  • Ne pokreće CC stream za hive-mind side memory polish
  • Ne menja Track G persona scripte u smeru memory walkthrough (čeka real workflow patterns)
  • Ne lock-uje arxiv §5.4 dogfood paragraf koji opisuje memory layer (čeka workflow validaciju)
  • Ne lock-uje KVARK pitch slide o memory differentiator-u (čeka workflow validaciju)

Šta radi paralelno (ne blokirano live testom)

  • CC A integration sprint priprema (kad bude trigger, post Wave 1.5)
  • Track A UI/UX Pass 2 review na updated Claude Design prototype (čim Marko ratifikuje fix preporuke iz Pass 1)
  • arxiv §1-§3 + §5.1-§5.3 + §6-§10 finalize (memory dogfood §5.4 ostaje placeholder)
  • Landing v3 finalize (proof card 1 ima Faza 1 brojeve, ne traži memory dogfood data)
  • Stripe products + Egzakta legal kickoff (Marko-side)
  • Hermes intel integration u canonical competitive doc

Live test sesija — operativni format (PM predlog)

Trajanje: 60-90 min PM + Marko, sinhrono na Marko-ovoj mašini kroz Computer Use ili screen-share equivalent Preduslovi: clean Claude Code sesija + hive-mind installed sa najsvežijom Wave 1 cleanup verzijom (CC B branch a10867c ili merged main posle integration sprint) Skripta: PM autoring dan pre sesije, 8-10 koraka koji systematic-ally prolaze kroz svih 10 audit gap-ova + coexistence patterns + tipičan dnevni workflow (3-4 tasks) Output: session report sa tabelom (G# × replicable yes/no/partial × notes) + workflow log + screenshot capture × kritični trenuci + Wave 1.5 P0 / P1 / P2 razrešenje na bazi findings

Predlog za zakazivanje: Marko bira slot u sledećih 48-72h (1-3 svibnja). PM priprema skriptu 24h pre slot-a.


Audit trail anchors

  • Coexistence LOCK: feedback_memory_systems_coexistence.md
  • Audit dokument source: D:\Projects\memory-architecture-audit-2026-04-29.md
  • CC B closure: project_cc_sesija_b_closed_2026_04_30.md (Wave 1 cleanup u §2.4)
  • Pre-launch sprint context: decisions/2026-04-30-pre-launch-sprint-consolidation-LOCKED.md
  • This decision: decisions/2026-04-30-wave-1-5-brief-queued-behind-live-test.md

End of decision. Wave 1.5 brief on hold pending live test slot Marko ratifikacija.