LOCKED Decision — Branch Architecture (Phase 5 Baseline) + Opcija C Ratifikacija

Date: 2026-04-30 Status: LOCKED Author: PM Ratified by: Marko (paste action sequence executed 2026-04-30 morning) Supersedes: none — first formal branch architecture decision Binds: Phase 5 deployment baseline + future cross-stream integration policy


§1 — Discovery (Marko 2026-04-30 morning kickoff)

Tokom Phase 5 §0 preflight setup, otkrivene su tri strukturalne anomalije u repo state-u:

  1. Faza 1 manifest v7 SHA terminus iz memorije bio pogrešan. PM (ja) sam u Faza 1 closure decision memo i Phase 5 brief referencirao fa716ff9 kao SHA terminus. Stvarna realnost: fa716ff9 ne postoji u .git/objects (fatal: Not a valid object name). Pravi terminus je 6bc2089 — Checkpoint C closure ("held-out validation 15/15; §F.5 condition_2 — 2/3 PASS, gpt::gen1-v2 OVERFIT exposed"). PM hallucinated SHA bez verifikacije pri zatvaranju Faza 1.

  2. Faza 1 commits su bili dangling (orphaned). Ceo Faza 1 commit chain (Amendments 7-11 + Checkpoint B + Checkpoint C + bf9219a Gen 1 close) postojao je u .git/objects ali nije bio reachable iz nijedne grane (lokalne ili remote). git branch --contains 6bc2089 vraća prazno output. Garbage collection bi trajno izgubio Faza 1 evidence. Spaseno akcijom git branch gepa-faza-1 6bc2089.

  3. Tri paralelna stream-a su divergentna. Pri inspekciji grana otkriveno:

    • main (origin/main): Sprint 12 Task 1 finalized work (taxonomy + stats + B2 LOCK + smoke). HEAD = 5ec069e.
    • feature/c3-v3-wrapper: CC-1 Phase 4 closure. HEAD = c9bda3d (Phase 4.7).
    • gepa-faza-1 (novo kreirana): CC-GEPA Faza 1 closure. HEAD = 6bc2089 (Checkpoint C).
    • Niko od tri grana nije sadržao oba druga rada. Stream-ovi su radili paralelno bez integration sprint-a posle zatvaranja.

§2 — Decision

Phase 5 baseline = gepa-faza-1 grana (6bc2089). Nova grana phase-5-deployment-v2 kreirana iz gepa-faza-1 kao Phase 5 deployment branch. Stara phase-5-deployment (na Phase 4.7 + 1 forward-port commit ee946d1) obrisana — sadržaj forward-port commit-a već je u Faza 1 grani kao native Amendment 8 commit 4d43141.

phase_5_pre_deployment_sha = 6bc20897d3851072eda34e80070faf39772bee66 (skraćeno 6bc2089).


§3 — Trade-off acknowledgment (Opcija C consequences)

Phase 5 grana inherits:

  • Faza 1 manifest v7 + Amendments 1-11 (full GEPA evolution work)
  • gen1-v1 shape definicije (claude::gen1-v1, qwen-thinking::gen1-v1)
  • registerShape canonical API (Amendment 8 native)
  • Checkpoint B + C evaluation infrastructure
  • run-checkpoint-c.ts held-out validation runner

Phase 5 grana DOES NOT inherit:

  • CC-1 Phase 4 long-task agent fixes (failure classifier, reporting module, messages-array compression, runRetrievalAgentLoopWithRecovery). Ti fix-evi su za production reliability long-task (multi-step research) execution. Phase 5 deployment GEPA-evolved variants su pre svega za simple-medium task profile; long-task fixovi mogu biti merged u Phase 5 granu kasnije ako monitoring (§3 brief) pokaže da je production traffic dominantno long-task.
  • Sprint 12 Task 1 main work (benchmark taxonomy + stats infrastructure). To je za benchmark execution, ne za production deployment monitoring.

Mitigation za missing Phase 4 long-task fixes:

  • Phase 5 §3 monitoring infrastructure aktivno prati error_rate (loop_exhausted, timeout, parse_fail). Ako loop_exhausted rate prelazi 5% baseline, halt-and-PM trigger sa "long-task fixes potrebni" rationale.
  • Selective cherry-pick mogućnost (commits c9bda3d, be8f702, e906114, 4d0542f, 8b8a940 iz Phase 4 chain) ostaje opcija ako monitoring pokaže potrebu.

§4 — Hindsight lessons + future binding

§4.1 — SHA verifikaciona disciplina

Lekcija: Pri zatvaranju Faza 1, PM (ja) je referencirao SHA terminus iz memorije bez git rev-parse ili git log verifikacije. Rezultat: pogrešan SHA propagiran u dva decision memo + Phase 5 brief + memory entry.

Future binding: Bilo koji SHA reference u decision memo, brief, ili memory entry MORA biti verifikovan pre commit-a sa explicit git rev-parse ili git log output zalepljen u audit trail. Forbidden: "from memory" SHA references.

Memory entry: feedback_sha_verification_discipline.md (mirror: D:/Projects/PM-Waggle-OS/memory-mirror/feedback_sha_verification_discipline.md).

§4.2 — Integration sprint policy

Lekcija: Tri paralelna CC stream-a (CC-1 Phase 4 + CC-GEPA Faza 1 + Sprint 12 Task 1) su zatvorena nezavisno bez integration sprint-a. Rezultat: divergent grane, dangling commits, manuelna orchestration potrebna pre Phase 5 deployment.

Future binding: Posle zatvaranja bilo koja dva stream-a koji rade na zajedničkim packages (packages/agent, packages/core), integration sprint je obavezan pre dalje stream-specific rada. Integration sprint deliverables: merge-back u main + cross-stream test harmonizacija + branch hygiene check.

Memory entry: feedback_integration_sprint_policy.md (mirror: D:/Projects/PM-Waggle-OS/memory-mirror/feedback_integration_sprint_policy.md).

§4.3 — Dangling commit hygiene

Lekcija: Faza 1 commits su bili dangling jer grana sa kojom su radjeni nije ostala u repo (verovatno deleted post-merge ili nikad pushed). Bez git branch --contains provere, commits su mogli biti garbage collected.

Future binding: Posle zatvaranja sprint-a sa significant commit chain, kreiraj backup granu (<sprint-name>-archive) kao protection od GC. Jednostavna komanda u session_end_protocol checklist.


§5 — Integration sprint deferred to post-Phase-5 production-stable

Posle Phase 5 production-stable transition (~6-8 nedelja od kick-off-a, per Phase 5 brief §4.3 definicija), zaseban integration sprint:

  1. Merge gepa-faza-1 (sa Phase 5 production deployments) u main
  2. Merge feature/c3-v3-wrapper (Phase 4 long-task fixes) u main — ili selective cherry-pick ako Phase 5 monitoring pokaže da nisu potrebni
  3. Resolve merge konflikte u packages/agent
  4. Cross-stream test harmonizacija (kombinovani test count target)
  5. Brief + decision memo za integration sprint closure

Prio: medium (ne blokira Phase 5, blokira post-Phase-5 development).


§6 — Audit trail anchors

  • Phase 5 baseline grana: phase-5-deployment-v2 (head 6bc2089)
  • Faza 1 archive grana: gepa-faza-1 (head 6bc2089, identican sa baseline po definiciji)
  • Faza 1 closure decision memo: decisions/2026-04-29-gepa-faza1-results.md (treba SHA fix)
  • Phase 5 brief: briefs/2026-04-29-phase-5-deployment-brief-v1.md (treba SHA + branch fix)
  • Phase 5 brief LOCKED memo: decisions/2026-04-29-phase-5-brief-LOCKED.md (treba SHA + branch fix)
  • Phase 5 scope LOCKED memo: decisions/2026-04-29-phase-5-scope-LOCKED.md (no fix needed)
  • Stara phase-5-deployment grana: deleted (was ee946d1, redundant sa 4d43141)

End of LOCKED decision. Phase 5 baseline ratifikovano. SHA fix propagacija + brief update u toku.