May 8 Follow-up Audit — Phase 1 Health + Day-2 Wave Recommendation

Audit date: 2026-05-08
Triggered by: 7-day follow-up schedule set in DAY-2-BACKLOG-2026-05-01.md §5
Authoring agent: claude-sonnet-4-6 (one-shot follow-up)


1. Phase 1 Feature Health

FR #6 — Tour Replay (commit f4e3591)

Drift commits since f4e3591 touching Phase 1 files:

Commit File What
277bb3a SettingsApp.tsx Phase 4.1 tab tier-filter
2711f9a SettingsApp.tsx Phase 4.1 hide Privacy & Telemetry at Essential
2d86480 SettingsApp.tsx Phase 4.1 Erase All Data button + dialog (General tab)

All 3 drift commits operate on the General tab — none touch the Advanced tab where the replay buttons live.

Symbol verification:

Symbol File Line Status
replayTour exported useOnboarding.ts 170
data-testid="replay-tour-button" SettingsApp.tsx 891
data-testid="replay-wizard-button" SettingsApp.tsx 911

Known gap (pre-existing, not new drift): FR Pass7-A — replayTour() has no state.completed guard. Documented in the Day-2 backlog on 2026-05-01 at the same moment Phase 1 shipped. This is a Day-2 Wave 1 queue item, not a regression.

FR #7 — Pending Imports Reminder (commit 4874f15)

Drift commits: 0. No commits touched MemoryApp.tsx, ImportReminderBanner.tsx, or import-reminder-state.ts since Phase 1 shipped.

Symbol verification:

Symbol File Line Status
ImportReminderBanner imported MemoryApp.tsx 14
ImportReminderBanner mounted above tab bar MemoryApp.tsx 208
shouldShowImportReminder 4-gate ladder import-reminder-state.ts 44

Four-gate verification: Gate 1 = !onboardingCompleted suppresses, Gate 2 = permanentlyRetired suppresses, Gate 3 = harvestEventCount > 0 suppresses, Gate 4 = dismissed within 7-day reshow window suppresses. Logic intact; no changes since Phase 1 ship.

Tests

npx vitest run could not execute — vitest binary is not installed in the audit environment (no npm install run). This is an environment gap, not a regression. The test file apps/web/src/lib/import-reminder-state.test.ts still exists unmodified; next developer CI run will exercise it.

GitHub issues

No open issues in marolinik/waggle-os. No user complaints about Tour Replay or Import Reminder (search: "tour replay", "import reminder", "FR #6", "FR #7" — all 0 results).

Verdict: Both Phase 1 features HEALTHY. 0 symbol regressions, 0 user complaints.


2. Day-2 Wave Priority Recommendation

What shipped since Phase 1 (Phase 4.1, 14 commits, 2026-05-01 → 2026-05-08)

  • Monetization infra (www/): Clerk auth UI, Stripe test-mode prices, checkout route, Customer → Clerk metadata wiring.
  • Product polish: persona-aware skill chips, persona-aware connector recommendations, Settings tab tier-filter, light-mode contrast fixes, onboarding default tier → simple.
  • Compliance: GDPR Art. 17 Erase All Data flow (server route + Settings UI), data-handling policy doc.
  • Trust band: /docs/methodology Next.js page, Lighthouse 96/96/100 pass.
  • No Day-2 Wave features have shipped. OverlayQueue, weightedFrameCount, Memory Growth Chart, FR #30, Continuity Banner, Today's Brief, Milestones, Weekly Wins — all still at backlog status.

Signal summary

Signal Reading
Monetization infra Done — Stripe + Clerk wired (test mode); no Wave features depend on it
Open user issues 0 — no user pressure on any specific Day-2 feature
FR Pass7-A, Pass7-C Pre-existing gaps, Wave 1 queue; small (5 + 10 LOC)
Phase 4.1 sprint landed today Clean slate — no in-flight work blocking Wave 1 start

Recommendation

Greenlight Wave 1 now. Rationale:

Wave 1 delivers the shared weightedFrameCount helper and OverlayQueue controller that Waves 2, 3, and 4 all depend on. Shipping these first removes the inter-wave blocker. Memory Growth Chart and FR #30 persona-picker indicator are the lowest-risk feature additions (~2-3h each) and directly reinforce the memory-moat positioning that the Phase 4.1 sprint's trust-band work set up.

Pair FR Pass7-A (5 LOC, replayTour wizard guard) and FR Pass7-C (10 LOC, cascade offset fix) into Wave 1 as they are single-file edits with no risk.

Defer Wave 2 (Continuity Banner + Today's Brief Dashboard Card) until Wave 1's OverlayQueue merges — both surfaces depend on it for priority arbitration, and Today's Brief needs the §1.5 LLM cost cap wired to the new cost-tracker hooks.

Defer Wave 3 (Milestone Cards) until usage data shows real frame accumulation. Toast at 1st frame and 10th frame require actual users hitting those thresholds to be meaningful; the Phase 4.1 simple tier default and Stripe wiring are about to drive first real signups — wait 2 weeks for baseline frame data before shipping celebrations.

Defer Wave 4 (Weekly Wins Digest) — it is the heaviest feature (~6h with HybridSearch instrumentation as a pre-req) and has no urgency signal. Sequence after Wave 2 ships.

Recommended Wave 1 scope:

  1. packages/shared/src/frame-weights.tsweightedFrameCount(frames) helper
  2. apps/web/src/lib/overlay-queue.tsOverlayQueue controller
  3. apps/web/src/components/os/apps/memory/MemoryGrowthChart.tsx — Feature #1
  4. FR #30 option B — persona-picker indicator in chat window header (~50 LOC)
  5. FR Pass7-A — replayTour wizard guard in useOnboarding.ts (~5 LOC)
  6. FR Pass7-C — cascade offset fix in window-cascade.ts (~10 LOC)

Estimated effort: ~6-7h. Matches original Day-2 backlog estimate.


3. Drift Summary

Category Count Detail
Post-Phase-1 drift commits 3 All Phase 4.1, General tab only — no regression
Symbols renamed/removed 0 All 5 checked symbols intact
Tests failing N/A vitest not installed in audit env
GitHub user complaints 0 0 open issues, 0 search hits
PR opened No No drift criteria met

4. Action taken

No PR opened. All Phase 1 symbols intact, no user complaints, no test regressions detectable. This report committed to docs/ as the audit artifact.

Next session: implement Wave 1 per §2 recommendation above. Start with frame-weights.ts + overlay-queue.ts infra (pre-reqs for everything else), then FR Pass7-A + Pass7-C as quick wins, then Memory Growth Chart.