This commit is contained in:
@@ -0,0 +1,95 @@
|
||||
# LOCKED — PM-RATIFY-VERTEX-BATCH-ELIGIBILITY Verdict, INFEASIBLE ACCEPT, Branch A CLOSED
|
||||
|
||||
**Date**: 2026-04-24
|
||||
**Ratified by**: Marko Marković (via PM adjudication)
|
||||
**PM**: claude-opus-4-7 (Cowork)
|
||||
**Prerequisite gate**: §1.3e strict hold → §1.3f Branch A activation → Vertex AI Batch Prediction eligibility probe
|
||||
**Probe cost**: $0.02 (under $0.05 cap)
|
||||
|
||||
## Odluka
|
||||
|
||||
**INFEASIBLE ACCEPT** — `gemini-3.1-pro-preview` nije u Vertex AI Batch Prediction registry-ju, iako jeste u publisher catalog-u. Branch A (Vertex Batch rerouting za Gemini cell) **CLOSED permanently** dok Google ne promeni product posture za preview modele. §1.3e fallback matrix redukovana na jedan aktivni branch (B).
|
||||
|
||||
## Evidence chain
|
||||
|
||||
CC-1 probe (anchor `8ad0567`, 9-commit parent chain od v4 anchor-a `dedd698`) tri data points:
|
||||
|
||||
1. **REST GET publisher catalog HTTP 200** — model postoji u opštem catalog-u.
|
||||
2. **SDK BatchPredictionJob.submit() 404** na oba naming forma (`gemini-3.1-pro-preview` i `publishers/google/models/gemini-3.1-pro-preview`). Error message: `The PublisherModel gemini-3.1-pro-preview does not exist.`
|
||||
3. **Control test: `gemini-2.5-flash` submit PENDING state** (job ID `7779966002640453632`) kroz identičnu SDK plumbing. Control pokazuje da plumbing radi; rejection je model-specific.
|
||||
|
||||
Interpretacija: Vertex Batch maintain-uje separate registry od publisher catalog-a. Preview modeli su u potonjem, odsutni iz prvog. Error message je semantički misleading ("does not exist") ali operativno jasan: not batch-enabled.
|
||||
|
||||
## Scope discipline
|
||||
|
||||
CC-1 ispoštovao sve guards:
|
||||
- §11 frozen paths netaknuti (runner, judge-runner, failure-mode-judge, health-check, litellm-config.yaml)
|
||||
- Manifest v5 anchor `fc16925` intact, NO v6 emission
|
||||
- Ne Vertex adapter u benchmark execution path-u
|
||||
- Samo `benchmarks/probes/vertex-batch-eligibility/` + `.gitignore` + `.gitattributes` modifikovani (doc-infra additions za probe artefact pass-through + LF pin)
|
||||
- NO N=400 kick attempted
|
||||
- pip install `google-cloud-aiplatform google-cloud-storage` — pre-authorized one-off, versions logged u memo-u
|
||||
|
||||
Artefakt SHAs LF-pinned:
|
||||
- script: `4c30d25e...`
|
||||
- input: `2c90f83b...`
|
||||
- log: `5ef76b46...`
|
||||
- memo: `f3c0a747...`
|
||||
- output: NOT CREATED (correct under INFEASIBLE)
|
||||
|
||||
## Posledice za §1.3e fallback matrix
|
||||
|
||||
Bila: tri branka (A — Vertex Batch; B — manifest v6 reduced; C — P8 multi-project).
|
||||
Sad: jedan aktivni branch (B).
|
||||
|
||||
- **Branch A (Vertex Batch)**: CLOSED. Preview model ne eligible. Future: kada `gemini-3.1-pro-preview` promoted u GA, batch eligibility tipično sledi. Strategic signal za kalendar, ne immediate action.
|
||||
- **Branch B (Manifest v6 reduced Gemini coverage)**: STANDBY. Aktivacija samo ako Google quota ticket ne stigne do 2026-04-26 18:00 CET.
|
||||
- **Branch C (P8 multi-project)**: već odbačen pre §1.3f (audit/ToS rizik).
|
||||
|
||||
## Matrix binary sada
|
||||
|
||||
1. **Google approval ≤48h** → GATE-D-REKICK-GO sa pre-flight sequence (gcloud quota verify + probe v3 + N=400 kick). Manifest v5 path po planu.
|
||||
2. **Google ne-approval @ 48h checkpoint** → Branch B pivot = manifest v6 proposal brief (Gemini judge samo na primary hypothesis cells, ~800 calls umesto 2005; Opus+GPT duo nosi sekundarne cells; small κ re-validation $15-30).
|
||||
|
||||
## Nus-produkt (permanent retention)
|
||||
|
||||
gcloud SDK + ADC na CC-1 hostu ostaje operational za §1.3e GATE-D-REKICK-GO Step 1 (`gcloud alpha services quota list`). Python SDK-ovi (`google-cloud-aiplatform`, `google-cloud-storage`) ostaju za eventualne buduće Vertex potrebe. P-A1 investicija (~15 min) trajno korisna, ne propada sa Branch A retraction-om.
|
||||
|
||||
GCS bucket `egzakta-vertex-batch-probe-2026-04` ostaje u projektu `gen-lang-client-0674908699`; trivial storage cost, Marko discretion da obriše posle 7 dana.
|
||||
|
||||
## Parent commit chain
|
||||
|
||||
```
|
||||
fc16925 v5 anchor (MD/YAML pre-registration)
|
||||
ad324cc Step 2 primary rpm:20 (gemini-3.1-pro alias)
|
||||
3a146ef §1.3c probe v2 PASS (30/30 HTTP 200)
|
||||
e5696f4 Fold-in 3.5a alias naming reconciliation
|
||||
d0ab680 Fold-in 3.5b sibling alias defensive mirror
|
||||
1d3851d §1.3e RPD feasibility memo
|
||||
8ad0567 §1.3f Vertex Batch eligibility probe INFEASIBLE
|
||||
```
|
||||
|
||||
8 commits (tačno) od v4 anchor `dedd698`. HEAD intact. Zero N=400 calls executed.
|
||||
|
||||
## Task #29 progress
|
||||
|
||||
- §1.1 Path L-1 ✓
|
||||
- §1.2 Task 2.6 path ✓
|
||||
- §1.3 FAIL → §1.3b IN_SCOPE ✓
|
||||
- §1.3c PASS ✓
|
||||
- §1.3e RPD strict hold ✓
|
||||
- §1.3f Vertex Batch INFEASIBLE ✓ → Branch A CLOSED
|
||||
- **GATE-D-REKICK-GO blocked**: Google quota approval pending
|
||||
- **48h checkpoint**: 2026-04-26 18:00 CET → Branch B activation if no approval
|
||||
|
||||
## CC-1 state
|
||||
|
||||
HALTED. Awaiting either:
|
||||
(a) Marko ping "Google approval confirmed" → PM emituje GATE-D-REKICK-GO brief sa pre-flight sequence-om;
|
||||
(b) Marko ping "48h timeout" @ 2026-04-26 18:00 → PM emituje manifest v6 proposal brief za Branch B.
|
||||
|
||||
## Odbacivanja
|
||||
|
||||
- **Retry na different region** (npr. europe-west4 umesto us-central1): rejection je model-specific not region-specific; control test prošao u us-central1, isti plumbing radi.
|
||||
- **Workaround kroz batch-eligible substitute model** (Gemini 2.5 Pro batch): §5.2 consistency_constraint break + judge ensemble quality degradation. Odbačeno kao i P3 ranije.
|
||||
- **Retry za 24h**: Google batch registry promene sa GA promotion-om, ne na dnevnoj osnovi. Čekanje je bez merit-a.
|
||||
Reference in New Issue
Block a user