5.2 KiB
LOCKED — PM-RATIFY-VERTEX-BATCH-ELIGIBILITY Verdict, INFEASIBLE ACCEPT, Branch A CLOSED
Date: 2026-04-24 Ratified by: Marko Marković (via PM adjudication) PM: claude-opus-4-7 (Cowork) Prerequisite gate: §1.3e strict hold → §1.3f Branch A activation → Vertex AI Batch Prediction eligibility probe Probe cost: $0.02 (under $0.05 cap)
Odluka
INFEASIBLE ACCEPT — gemini-3.1-pro-preview nije u Vertex AI Batch Prediction registry-ju, iako jeste u publisher catalog-u. Branch A (Vertex Batch rerouting za Gemini cell) CLOSED permanently dok Google ne promeni product posture za preview modele. §1.3e fallback matrix redukovana na jedan aktivni branch (B).
Evidence chain
CC-1 probe (anchor 8ad0567, 9-commit parent chain od v4 anchor-a dedd698) tri data points:
- REST GET publisher catalog HTTP 200 — model postoji u opštem catalog-u.
- SDK BatchPredictionJob.submit() 404 na oba naming forma (
gemini-3.1-pro-previewipublishers/google/models/gemini-3.1-pro-preview). Error message:The PublisherModel gemini-3.1-pro-preview does not exist. - Control test:
gemini-2.5-flashsubmit PENDING state (job ID7779966002640453632) kroz identičnu SDK plumbing. Control pokazuje da plumbing radi; rejection je model-specific.
Interpretacija: Vertex Batch maintain-uje separate registry od publisher catalog-a. Preview modeli su u potonjem, odsutni iz prvog. Error message je semantički misleading ("does not exist") ali operativno jasan: not batch-enabled.
Scope discipline
CC-1 ispoštovao sve guards:
- §11 frozen paths netaknuti (runner, judge-runner, failure-mode-judge, health-check, litellm-config.yaml)
- Manifest v5 anchor
fc16925intact, NO v6 emission - Ne Vertex adapter u benchmark execution path-u
- Samo
benchmarks/probes/vertex-batch-eligibility/+.gitignore+.gitattributesmodifikovani (doc-infra additions za probe artefact pass-through + LF pin) - NO N=400 kick attempted
- pip install
google-cloud-aiplatform google-cloud-storage— pre-authorized one-off, versions logged u memo-u
Artefakt SHAs LF-pinned:
- script:
4c30d25e... - input:
2c90f83b... - log:
5ef76b46... - memo:
f3c0a747... - output: NOT CREATED (correct under INFEASIBLE)
Posledice za §1.3e fallback matrix
Bila: tri branka (A — Vertex Batch; B — manifest v6 reduced; C — P8 multi-project). Sad: jedan aktivni branch (B).
- Branch A (Vertex Batch): CLOSED. Preview model ne eligible. Future: kada
gemini-3.1-pro-previewpromoted u GA, batch eligibility tipično sledi. Strategic signal za kalendar, ne immediate action. - Branch B (Manifest v6 reduced Gemini coverage): STANDBY. Aktivacija samo ako Google quota ticket ne stigne do 2026-04-26 18:00 CET.
- Branch C (P8 multi-project): već odbačen pre §1.3f (audit/ToS rizik).
Matrix binary sada
- Google approval ≤48h → GATE-D-REKICK-GO sa pre-flight sequence (gcloud quota verify + probe v3 + N=400 kick). Manifest v5 path po planu.
- Google ne-approval @ 48h checkpoint → Branch B pivot = manifest v6 proposal brief (Gemini judge samo na primary hypothesis cells, ~800 calls umesto 2005; Opus+GPT duo nosi sekundarne cells; small κ re-validation $15-30).
Nus-produkt (permanent retention)
gcloud SDK + ADC na CC-1 hostu ostaje operational za §1.3e GATE-D-REKICK-GO Step 1 (gcloud alpha services quota list). Python SDK-ovi (google-cloud-aiplatform, google-cloud-storage) ostaju za eventualne buduće Vertex potrebe. P-A1 investicija (~15 min) trajno korisna, ne propada sa Branch A retraction-om.
GCS bucket egzakta-vertex-batch-probe-2026-04 ostaje u projektu gen-lang-client-0674908699; trivial storage cost, Marko discretion da obriše posle 7 dana.
Parent commit chain
fc16925 v5 anchor (MD/YAML pre-registration)
ad324cc Step 2 primary rpm:20 (gemini-3.1-pro alias)
3a146ef §1.3c probe v2 PASS (30/30 HTTP 200)
e5696f4 Fold-in 3.5a alias naming reconciliation
d0ab680 Fold-in 3.5b sibling alias defensive mirror
1d3851d §1.3e RPD feasibility memo
8ad0567 §1.3f Vertex Batch eligibility probe INFEASIBLE
8 commits (tačno) od v4 anchor dedd698. HEAD intact. Zero N=400 calls executed.
Task #29 progress
- §1.1 Path L-1 ✓
- §1.2 Task 2.6 path ✓
- §1.3 FAIL → §1.3b IN_SCOPE ✓
- §1.3c PASS ✓
- §1.3e RPD strict hold ✓
- §1.3f Vertex Batch INFEASIBLE ✓ → Branch A CLOSED
- GATE-D-REKICK-GO blocked: Google quota approval pending
- 48h checkpoint: 2026-04-26 18:00 CET → Branch B activation if no approval
CC-1 state
HALTED. Awaiting either: (a) Marko ping "Google approval confirmed" → PM emituje GATE-D-REKICK-GO brief sa pre-flight sequence-om; (b) Marko ping "48h timeout" @ 2026-04-26 18:00 → PM emituje manifest v6 proposal brief za Branch B.
Odbacivanja
- Retry na different region (npr. europe-west4 umesto us-central1): rejection je model-specific not region-specific; control test prošao u us-central1, isti plumbing radi.
- Workaround kroz batch-eligible substitute model (Gemini 2.5 Pro batch): §5.2 consistency_constraint break + judge ensemble quality degradation. Odbačeno kao i P3 ranije.
- Retry za 24h: Google batch registry promene sa GA promotion-om, ne na dnevnoj osnovi. Čekanje je bez merit-a.