Files
waggle-os/docs/wiki-test/index.md
Oleg Maslov 0c3e2ead3b
Some checks failed
Installer Smoke / installer-smoke (push) Has been cancelled
moving
2026-09-02 10:10:29 +02:00

2.8 KiB

Marko's Second Brain — Wiki Index

Compiled from 29 memory files + 422 session messages + git history. Source: Claude Code sessions, March 27 — April 13, 2026. Last compiled: 2026-04-13


Organizations

  • Egzakta Group — EUR 31M tech group, 200+ people, 3 founders, Netherlands holding

Products

  • Waggle OS — Desktop AI agent platform with persistent memory
  • KVARK — Sovereign enterprise AI platform (EUR 1.2M contracted)

People

Concepts

Development Timeline

Date What Happened Sessions
Mar 6 Name chosen: "Waggle" (from waggle dance). Vision, business model. Brainstorm
Mar 11 Phase 3 gap analysis — 48 critical gaps identified Analysis
Mar 17 B2B lead gen stress test — agent speed/persistence gaps found Testing
Mar 23 UAT score 84/100, "Honey on Dark Steel" design system M2
Mar 27-31 M2 sprint — 13 sessions, 10 commits. P0 fixes, network resilience, TS cleanup, keyboard flow, telemetry M2 Sprint
Apr 1-5 Deep refactoring marathon — multiple audit rounds, UI/UX overhaul Refactor
Apr 6-7 Agent intelligence sprint — 9 features, 112 tests, persona expansion Phase 1
Apr 8 Structural refactors — chat.ts split, personas.ts split, tools extract Session 2
Apr 9-10 ULTRAPLAN Phases 1-9 complete. 148 MCP servers. Real harvest (156 frames). Mega session
Apr 11 Phases A+B: The Room, per-session orchestrators, tiered autonomy. 50 tests. Killer day
Apr 12 (AM) Phase A/B binary verification. 11 bugs fixed. Verification
Apr 12 (PM) E2E suite 13/13 green. System map. Loading shimmer. Polish
Apr 12 (EVE) Phases C+D. 96 E2E. Tier restructure. Binary built. Mega session
Apr 12 (NIGHT) 3 P0s fixed. WeaverPanel. 101 dirty files committed. Cleanup
Apr 12 (S2) Trial expiry modal. MultiMindCache. Cross-workspace search. Features
Apr 13 29 commits. Team memory, S3/MinIO, KG, budget cap, Ollama, Memory MCP. Entire backlog cleared. MEGA
Apr 13 (now) Memory MCP 5 fixes. Wiki Compiler spec (1,639 lines). This session

Open Items

  • Stripe: Create PRO ($19) + TEAMS ($49) products in dashboard
  • Code signing: Purchase certificate for Windows installer
  • Wiki Compiler: 1,639-line spec ready, not yet implemented