Stage 2 Primary Config — LOCKED
Datum: 2026-04-22
Ratified by: Marko (2026-04-22)
Author: PM
Source memo: strategy/2026-04-22-stage-2-qwen-config-ratification-memo.md
Sprint 11 track: B1 CLOSED
Status: LOCKED — sve Stage 2 batch execution mora koristiti ratified config eksplicitno
1. Ratified config
thinking=on, max_tokens=64000 (safe config #1 iz Task 1.1 stability matrix pool-a)
Route: qwen3.6-35b-a3b-via-openrouter (OpenRouter bridge, canonical slug per project_target_model_qwen_35b.md).
2. Marko rationale
"JA bih on/64k thinking nam je u v05 dao dobre rezultate tako da bih ja obavezno radio sa thinking on"
V05 kontekst: prethodni interni eval gde thinking=on pokazao bolju performansu na LoCoMo-like task-ovima. Marko ne želi da recovery risk od thinking-off eliminaciji reasoning surface-a izvan zone gde on/64K je demonstratibly stabilan.
Operativno: thinking=on je default kroz ceo Stage 2 stack (mikro-eval, 4-cell mini, full-run). Thinking=off ostaje rezervisan kao contingency ako budući signal pokaže da reasoning ne doprinosi (ne pre Sprint 12 retrospektive).
3. PM preporuka odbijena sa razlogom
PM predlog bio je thinking=off, max_tokens=16000 zbog cost-per-call minimizacije i manjeg audit observability surface-a. Marko je prihvatio cost tradeoff u korist performance evidence-a iz v05 eval-a. Ova odluka je Marko-level strategic call i nadilazi PM cost-optimization heuristiku.
PM obaveze koje ulaze u igru zbog ovog izbora:
- Budget re-projection (§4 ovog dokumenta) — Stage 2 troškovi materijalno viši.
- H-AUDIT-1 scope extension (§5) — reasoning_content mora biti eksplicitno adresiran u design doc-u.
- Latency expectation (§6) — paradoksalno,
on/64Kje brži od PM-ove preporuke (17.9s vs 27.6s avg), tako da latency impact je pozitivan.
4. Budget re-projection
| Scenario | Per-call cost estimate | 4-cell mini (200 calls) | Full-run (2000 calls) |
|---|---|---|---|
PM preporuka off/16K |
$0.005-0.010 | ~$1.60-2.00 | ~$16-20 |
Ratified on/64K |
$0.015-0.025 | ~$3-5 | ~$30-50 |
| Delta | ~2.5x | +$1.50-3.00 | +$14-30 |
Per-task budget update:
| Task | Prior projection | Updated projection |
|---|---|---|
| B1 (config apply + smoke test) | $0.05 | $0.05 (unchanged) |
| C2 (Stage 1 mikro-eval) | $5-10 | $8-15 |
| C3 (Stage 2 4-cell mini) | $4-6 expected / $134 cap | $8-14 expected / $134 cap |
Cap-ovi ostaju nepromenjeni; samo expected values ažurirane. Sprint 11 total ceiling ostaje ~$150. H-42a/b Stage 2 full-run envelope ($1500-2600) apsorbuje ~$14-30 razliku bez impacta na gate odluku.
Judge cost-i (Sonnet 4.6) ostaju isti — tie-break policy i judge sampling unchanged.
5. H-AUDIT-1 scope extension (impact on Track A A1)
Thinking=on generiše reasoning_content polje u response-u. Za audit-grade reproducibility (Sprint 11 Track A exit criterion), svaki token surface mora biti rekonstruktabilan iz turnId-a. CC-1 Task A1 design doc mora eksplicitno pokrivati:
- Reasoning_content persistence rule: gde se reasoning_content persista u trace store-u (da li pod istim turnId ili u poseban slot).
- Reasoning_content retention policy: koliko dugo, gde se storuje, da li je deo audit export-a.
- Reasoning_content exclusion rule: gde ne-ulazi (npr. ne-smie u user-facing output log-ove ako trace ima public visibility).
Ovo je dodatak design doc-u, ne izmena scope lock-a (design doc je već Track A A1, extension je internal stavka).
CC-1 brief briefs/2026-04-22-cc-sprint-11-kickoff.md §3 Task A1 dobija add-on bullet za reasoning_content handling. Update u followup message-u.
6. Latency expectation
Task 1.1 data: avg 17.9s per call na on/64K vs 27.6s na off/16K. Razlog: on/64K konvergira brže jer model ne truncira razmišljanje.
Stage 2 wall-clock implications:
- 4-cell mini 200 poziva × 17.9s avg = ~60 min sekvencijalno (ili manje ako parallelizable).
- Full-run 2000 poziva × 17.9s = ~9.9h sekvencijalno, staje u 1 radni dan sa parallel batch-ovima.
Net pozitiv vs PM preporuka na wall-clock.
7. CC-1 apply akcija (Task B1 execution)
Čim ovaj decision dokument landuje, CC-1 u Task B1:
- Ažurira LiteLLM default config za Stage 2 batch runs:
thinking: true (ili ekvivalent parameter naziv u harness-u) max_tokens: 64000 model: qwen3.6-35b-a3b-via-openrouter - Verifikuje da C2 i C3 harness koristi taj config eksplicitno, ne nasleđeno iz drugog lokala.
- Smoke test 1 poziv. Log cost, latency, reasoning_content size.
- Posti exit ping u
sessions/2026-04-XX-sprint-11-b1-config-applied.md.
B1 CLOSE gate za Track B.
8. Anti-pattern note
Stage 2 ne menja config tokom run-a. Ako C3 faila sa 3 attempts na on/64K, HARD STOP i PM review — ne automatska reformulacija na off/16K sredinom sprinta (anti-pattern #4 iz Workflow Reality Check + re-run policy iz project_preflight_gate.md).
Thinking=off je legitimana contingency samo ako PM retrospective posle Sprint 11 ili Sprint 12 full-run-a identifikuje specifičan shape gde thinking=on sistematski ne daje lift. Do tada — config je LOCKED na on/64K.
9. Related
strategy/2026-04-22-stage-2-qwen-config-ratification-memo.md— source memo (5 safe configs side-by-side)sessions/2026-04-22-sprint-10-task-1-1-exit.md— Task 1.1 stability matrix PASS, 5 safe configsdecisions/2026-04-22-sprint-11-scope-locked.md— Sprint 11 scope authoritybriefs/2026-04-22-cc-sprint-11-kickoff.md— CC-1 execution brief (B1 task opis, dobija reasoning_content add-on)decisions/2026-04-20-preflight-stage2-4cell-amendment.md— 4-cell ablation struktura.auto-memory/project_target_model_qwen_35b.md— Qwen3.6-35B-A3B kanonski engine.auto-memory/project_preflight_gate.md— 3-stage gate struktura.auto-memory/project_h_audit_1_not_implemented.md— turnId implementacija context (reasoning_content handling extension)
Stage 2 primary config LOCKED na thinking=on, max_tokens=64000. CC-1 Task B1 unblocked.