11 KiB
CC-1 Brief — Task 2.5 Stage 3 N=400 Re-Kick (Option A ratified)
Date: 2026-04-24
Status: GATE-D-ADJUDICATION-ACCEPT-OPTION-A
PM: Marko Marković (ratifikovano 2026-04-24)
Prior state: Gate D Deviation Halt (see sessions/2026-04-24-task25-stage3-n400-deviation-halt.md)
§0 Kontekst i odluke
Gate D Deviation Halt adjudikovan. Option A ACCEPT — Gemini 3.1 Pro Tier 2 upgrade.
Billing status (potvrđeno 2026-04-24 via Google AI Studio screenshot):
- Account: Egzakta (ID: 01DBA5-921E58-9DAF46)
- Tier: Tier 2 LIVE (60 → 1000 RPM, 14,400 → 50,000 RPD)
- Balance: credit $63.20
- Pricing: unchanged
Manifest v4 anchor: dedd69888e008fb1584bc249aff43b19f55a88e5 (short dedd698) — ostaje validan ex-ante lock, ne reemituje se.
Code freeze HEAD: 373516c2784807da8536dbc0c194c54f4e4cd4be — nepromenjen.
SYSTEM_AGENTIC bytes SHA-256: 6facae6decc44a6404290514accb4f7cb364081b32d02847a20f8e871633e328 — nepromenjen.
Odbačene opcije u adjudikaciji: C (judge swap, §5.2 break), D (token-bucket limiter, code-freeze break), E (Promise.allSettled + 2-of-3 quorum, code-freeze + §5.2 break), G (no-op, bad EV). Option F (stop at Gate C) ostaje u zadnjoj ruci ako Option A pipeline ne prođe prerequisites.
§1 Tri blocker prerequisites pre N=400 re-kick-a
Svi prerequisites su non-negotiable. CC-1 ne re-kick-uje dok svi nisu zatvoreni i PM-ratifikovani.
§1.1 Lock semantics clarification memo
Issue: Gate D deviation halt §2.3 zabeležio je runner-lock race — dva pid-a (65668 + 4984) akvirirala .benchmark-runner.lock unutar 3-sekundnog prozora dok je wrapper izvršavao --parallel-concurrency 2. Manifest v4 §7.4 navodi concurrent_runners: FORBIDDEN, što u literalnom čitanju koliziuje sa §3 concurrency=2.
Operativna interpretacija koju PM ratifikuje:
§7.4 concurrent_runners: FORBIDDEN pokriva cross-process threat model — sprečavanje dva nezavisna npx tsx scripts/run-mini-locomo.ts poziva iz različitih terminala/shellova. Intra-wrapper spawnovanje kroz --parallel-concurrency 2 iz jedne CLI invokacije JESTE dozvoljeno.
Zahtev prema CC-1 (memo ≤ 250 reči, deliverable benchmarks/results/manifest-v4-lock-semantics-clarification.md):
- Potvrdi interpretaciju gore ili predloži alternativu sa dokazom iz koda.
- Odluči jedan od dva puta za konkretno lock-race adresiranje:
- Path L-1 (preferred ako je moguće bez code-freeze break-a): per-cell output-path šema tako da dva intra-wrapper spawn-a ne konkurišu za isti
.benchmark-runner.lockfajl (npr..benchmark-runner.<cell>.lock). Ako ovo znači promenu izvornog koda u frozen path-u, prijavi to i prelazi na Path L-2. - Path L-2 (fallback): ako se race ne može pokriti waiver-om bez code-freeze break-a, CC-1 predlaže manifest v5 amendment sa concurrency=1. PM odlučuje manifest v5 emisiju kao zaseban gate.
- Path L-1 (preferred ako je moguće bez code-freeze break-a): per-cell output-path šema tako da dva intra-wrapper spawn-a ne konkurišu za isti
- Anchor clarification commit na
feature/c3-v3-wrapper, SHA-256 hash memo fajla u halt ping-u za PM ratifikaciju.
§1.2 Runner early-exit RCA memo
Issue: Gate D deviation halt §2.2 zabeležio je runner early-exit na ~15 min bez halt markera u logovima. Sumnja: uncaught Promise rejection iz judge-runner.ts:386-400 catch-all paternom + Promise.all([opus, gpt, gemini]) u judgeEnsemble — prvi 429 iz Gemini-ja ubija ceo ansambl i uspeli Opus/GPT verdici se gube.
Zahtev prema CC-1 (memo ≤ 250 reči, deliverable benchmarks/results/manifest-v4-runner-early-exit-rca.md):
- Potvrdi ili odbaci hipotezu: da li je early-exit path triggered isključivo pod 429 judge cascade, ili postoje drugi failure modes (npr. subject timeout, JSON parse error, network flap, memory exhaust) koji takođe vode u isti uncaught-rejection exit?
- Ako isključivo 429: log kao Task 2.6 tech-debt sa explicit ticket reference-om (ime + broj + acceptance criteria za defensive patch). Option A Tier 2 upgrade onda praktično maskira simptom dok se patch ne ubaci.
- Ako drugi failure modes postoje: ne re-kick bez defensive patch-a. To automatski znači code-freeze break (npr.
Promise.allSettled+ 2-of-3 quorum) = manifest v5 emisija = Gate P reiniciranje. PM odlučuje u tom trenutku. - Anchor RCA memo commit na
feature/c3-v3-wrapper, SHA-256 hash u halt ping-u.
§1.3 Gate P+ pre-flight probe
Cilj: deterministički verifikovati da Tier 2 upgrade zaista propagirao pre nego što se troši $23 na N=400.
Specifikacija probe-a:
- Subject:
gemini-3.1-pro-preview(ista ruta i isti API key koji će Stage 3 koristiti) - Volume: 50 poziva u 30-sekundnom prozoru (= 100 RPM burst, iznad Tier 1 ceiling-a od 60 RPM ali komfortno unutar Tier 2 od 1000 RPM)
- Payload: minimum viable judge call — LoCoMo instance iz canonical SHA dataset-a (npr. prva iz konverzacije 0), structured prompt identičan Stage 3 judge prompt-u
- Pass criterion: 0 × HTTP 429 preko svih 50 poziva. Bilo koji 429 = probe FAIL = no re-kick, vraćamo se PM-u.
- Deliverable:
benchmarks/results/stage3-gate-p-plus-probe-log.jsonlsa svim 50 poziva (timestamp, latency, status code, rate-limit headers X-RateLimit-*), plus aggregate summary memo ≤ 100 reči.
Budget: probe trošak je ~$0.10-0.30, dodaj u Stage 3 ukupni cap (expected final: ~$23.30, headroom ~22% pod $30 cap).
§2 Re-kick authorization uslovi
CC-1 pokreće N=400 kick tek kada su SVA tri uslova zadovoljena:
- §1.1 lock semantics memo delivered, PM ratified (Path L-1 ili L-2 adjudicated)
- §1.2 runner early-exit RCA memo delivered, PM ratified (tech-debt ili patch path adjudicated)
- §1.3 Gate P+ probe executed, 50/50 pass, probe log + memo delivered, PM ratified
Ako bilo koji prerequisite blokira (Path L-2 triggers manifest v5, ili RCA otkriva drugi failure modes, ili probe FAIL), CC-1 emituje novi halt ping i čeka PM adjudikaciju. Ne self-advance ni u jednom scenariju.
§3 N=400 execution (nepromenjen od Gate P)
Kada re-kick uslovi prođu, CC-1 izvršava identičnu CLI invokaciju kao u Gate P ratifikaciji:
npx tsx scripts/run-mini-locomo.ts \
--manifest benchmarks/results/manifest-v4-preregistration.yaml \
--subject qwen3.6-35b-a3b-via-dashscope-direct \
--subject-fallback-1 qwen3.6-35b-a3b-via-openrouter \
--judge-ensemble claude-opus-4-7,gpt-5.4,gemini-3.1-pro \
--v3-cells --N 400 --parallel-concurrency 2 --seed 42
Budget: $30 cap / $28 hard halt / ~$23 expected subject + ~$0.30 probe = ~$23.30 total expected.
Stopping rules: manifest v4 §8 nepromenjen (budget, streak, health check, runner lock, deviation).
Post-hoc exclusion: NONE. evaluator_loss u denominatoru per §9.
Deviation response: halt + restart-required per §10.
§4 Gate D exit report (nepromenjen od Gate P)
Posle N=400 exit, CC-1 emituje exit ping sa §0-§6 strukturom u sessions/2026-04-24-task25-stage3-n400-complete.md:
- §0 Manifest v4 SHA-ove re-verify (MD + YAML, ne smeju drift-ovati)
- §1 Primary endpoint: Fisher one-sided p check, retrieval − no-context ≥ 5pp, Wilson 95% CI
- §2 Secondary endpoints S1-S5 (monotonicity chain pairwise p<0.20, agentic-retrieval, abstain penalty), cluster bootstrap 10000 iter CI
- §3 Evaluator-loss count reported separately (ne iz denominatora)
- §4 Fleiss' κ pre-tiebreak judge matrix (pass ≥0.65, flag 0.60-0.65, halt ≤0.60)
- §5 Budget actual vs $28 halt, deviation count (expected 0)
- §6 SOTA claim composition scope (NOT the claim itself — CC-1 delivers scope + data, PM+Marko compose public claim)
CC-1 halt at Gate D. No self-advance to SOTA claim composition. Taj korak radi PM + Marko.
§5 Task 2.6 carry-over (tech-debt registar)
Sledeći elementi ulaze u Task 2.6 carry-over bez obzira na Stage 3 ishod:
- Subject-only per-cell budget gap (
runner.ts:396/line 428) — known tech-debt, dokumentovan ali nije blocker pod Option A (Tier 2 headroom apsorbuje rizik pod $30 cap) - Judge-ensemble defensive error handling — ako §1.2 RCA potvrdi "isključivo 429" hipotezu, Task 2.6 entry za
Promise.allSettled+ 2-of-3 quorum patch sa clear acceptance criteria - Runner-lock race edge case — ako §1.1 Path L-1 prođe per-cell output-path šemom, treba permanent fix u Task 2.6 umesto waiver-based
- Gate P+ probe template — ako probe metodologija radi, upakovati kao reusable pre-flight check za buduće benchmark rate-limit-sensitive stream-ove
§6 How to apply
Za CC-1 (paste-ready direktiva):
GATE-D-ADJUDICATION-ACCEPT-OPTION-A ratified by PM 2026-04-24.
Gemini 3.1 Pro Tier 2 is LIVE (Egzakta billing account). Manifest v4
anchor dedd698 remains valid. Code freeze HEAD 373516c remains.
Execute three prerequisites in sequence before N=400 re-kick:
1. Deliver lock semantics clarification memo per brief §1.1. Anchor on
feature/c3-v3-wrapper. Halt with PM-RATIFY-LOCK-SEMANTICS ping
containing memo SHA-256 + Path L-1 vs L-2 recommendation.
2. Deliver runner early-exit RCA memo per brief §1.2. Anchor on
feature/c3-v3-wrapper. Halt with PM-RATIFY-RCA ping containing memo
SHA-256 + tech-debt vs patch-required recommendation.
3. Execute Gate P+ pre-flight probe per brief §1.3. Deliver probe log
+ summary memo. Halt with PM-RATIFY-PROBE ping containing probe
pass/fail status + artefact paths.
After all three PM ratifications, emit GATE-D-REKICK-GO request. PM
issues final kick authorization. CC-1 executes §3 CLI invocation,
halts at Gate D per §4 exit report structure. No self-advance.
Full brief at: D:\Projects\PM-Waggle-OS\briefs\2026-04-24-cc-task25-stage3-rekick-option-a.md
Za PM (kontrolne tačke):
- Gate Lock Semantics: ratifikuj Path L-1 (clean) ili L-2 (manifest v5 trigger)
- Gate RCA: ratifikuj tech-debt (preferred) ili patch-required (manifest v5 trigger)
- Gate P+ Probe: 50/50 pass = ratified, bilo koji 429 = halt + re-adjudicate
- Gate D Exit: verifikuj §0-§6 artefakt, advance to SOTA claim composition
Failure modes koje vraćaju na adjudikaciju:
- Path L-2 ratified → manifest v5 emisija (concurrency=1, ~16h wall-clock)
- RCA otkriva drugi failure modes → manifest v5 emisija (Promise.allSettled + quorum patch)
- Probe 429 → Tier 2 propagation issue, PM eskalira Google billing support
- Bilo koja deviation tokom N=400 → halt per §10, restart required after fix
§7 Reference
- Manifest v4 MD:
benchmarks/results/manifest-v4-preregistration.md(SHA-256ce35b7eb...3525f) - Manifest v4 YAML:
benchmarks/results/manifest-v4-preregistration.yaml(SHA-256b626322d...401d3) - Gate D Deviation Halt:
PM-Waggle-OS/sessions/2026-04-24-task25-stage3-n400-deviation-halt.md - Gate P Ratification: auto-memory
project_task25_stage3_gate_p_ratified.md - Gate D Adjudication: auto-memory
project_task25_stage3_gate_d_deviation_adjudicated.md - Bench-Spec LOCK v1:
benchmarks/specs/bench-spec-lock-v1.md