497 B
497 B
Stage 3 §1.3c Throttle Verification Probe — Summary
Date: 2026-04-24 · Log: benchmarks/results/stage3-gate-p-plus-probe-v2-log.jsonl (30 rows).
Verdict: PASS — 30 / 30 HTTP 200, zero 429. Latency ms: min=2611, p50=3094, p95=7861, max=16234. Wall-clock 99.5 s.
Kickoff: claude_code_bash_tool_synchronous; LiteLLM container waggle-os-litellm-1 restarted post-Step-2 to load rpm: 20. Max 16 s latency = LiteLLM queuing under throttle (working as designed, no 429).