7.8 KiB
LOCKED Decision — Track E Arxiv Skeleton 7-Decision Ratifikacija
Date: 2026-05-02 Status: LOCKED Author: PM (decision memo authored retroactively 2026-05-05 to close decisions/ folder gap iz consolidation 2026-05-04) Ratified by: Marko (interactive 7-decision sesija 2026-05-02 sa surgical refinements za odluke 1, 4, 6, 7; explicit "uradi to sve" 2026-05-05 to author missing decision memos) Binds: Arxiv preprint drafting kick-off, Path A+D combination endorsement strategy, 3-author roster, Day 0 decoupling od arxiv timing Cross-references:
research/2026-04-26-arxiv-paper/03-paper-skeleton-v2-2026-04-30.md(10-section skeleton + 7 decision points authored 2026-04-30)decisions/2026-04-30-pre-launch-sprint-consolidation-LOCKED.md(Track E sequencing)project_benchmark_strategy.mdmemorija (Pavlukhin EVOLVESCHEMA author atribucija LOCKED 2026-04-20)project_pilot_2026_04_26_result.mdmemorija (multiplier teza conditional finding source)project_gepa_faza1_closed_2026_04_29.mdmemorija (GEPA cross-family evidence source za §5.4)project_n400_run_state_2026_04_24.mdmemorija (LoCoMo paper claim #1 LOCKED, +27.35-point methodology gap source)- Memory entry
project_track_e_arxiv_closed_2026_05_02.md(point-in-time observation, primary source)
§1 — Trigger i steering kontekst
Track E iz pre-launch sprint-a — arxiv skeleton ratification kao gate za drafting kick-off. PM facilitirao 7-decision interactive sesiju sa Markom 2026-05-02. Marko prešao iz "ratify pojedinačno" u "sve ti, vec znas o celoj prici" steering delegacije za većinu odluka, ali zadržao surgical refinements za 4 framing odluke (4, 6, 7, plus title 1).
§2 — Sedam ratifikovanih odluka
Odluka 1 — Title
Final: "Apples-to-Apples on LoCoMo: A Bitemporal Local-First Memory Substrate and a +27.35-Point Methodology Gap."
Marko-revised, methodology-led, +27.35 hook. Rejected PM rec za cross-family generalization title (sekundarna narrativna linija).
Abstract reorder: 1. rečenica methodological, 2. architectural, 3. brojevi.
Odluka 2 — Co-author roster
Final: 3-author paper.
- Marko (lead/corresponding)
- Pavlukhin (Egzakta tech lead, EVOLVESCHEMA author per
project_benchmark_strategyLOCK 2026-04-20) - Barać (Full Professor FON UB, e-business)
Co-author 2 (methodology consult slot) DROPPED — Barać preuzima cross-check rolu pored academic advisor.
Odluka 3 — Endorsement path A+D combination
Path A primary (Marko 2026-05-03 ponedeljak): Pavlukhin podnosi EVOLVESCHEMA na arxiv kao standalone short preprint (4-6 strana, cs.AI). Posle arxiv approval (~24h), Pavlukhin endorses Markov paper kao nezavisni researcher (NE mora biti coauthor). Single email request to direct contact, ne cold outreach. Timeline 5-6 dana to endorsement-ready, compatible sa Day 0 ETA 6-10 dana.
Path D fallback decoupling: Day 0 launch decoupled od arxiv timing. Landing Trust Band Card 4 "Published methodology — arxiv preprint" zamenjuje se sa "Open methodology — github docs" (markdown methodology doc u OSS repo). Arxiv preprint linkujemo retroactively post-launch news cycle.
Odluka 4 — Multiplier disclosure
Final: Eksplicitna "Negative Result" subsekcija u §6 Discussion sa 5 elemenata:
- Hypothesis (multiplier teza)
- N=12 protocol
- Brojevi h2=1/3, h3=0/3, h4=0/3
- Preconditions for re-test imenovane
- Qualification "ne aplicira na primary contribution"
NOT "deferred" framing u headline — to ide u footnote.
Odluka 5 — GEPA scope §5.4
Final: Zadržava ~1.5 page sub-section format (PM rec a). Plus footnote: "Extended cross-family treatment in companion paper, in preparation."
Razlog: standalone §5 GEPA bi koštao desk-reject rizika; cross-family generalization je dovoljno jako da nosi sopstveni preprint za 6-8 nedelja sa ERL methodology framing.
Odluka 6 — §5.5 framing
Final: ACTIVE-VOICE rewrite — "Bias-detection guardrails functioning as designed". NE "methodology maturity demonstration" (defanzivno).
Aktivni glagoli:
- "GPT selection bias detected and filtered by held-out"
- "qwen-non-thinking decoupling probe revealed effect"
- "calibration evolved across Amendments 7-11"
Odluka 7 — Forward reference §5.6
Final: REVISED statement: "Production traffic Pass II rates, p95 latency, and recall@K on production traffic distribution from Phase 5 deployment will be reported in v2 of this preprint, scheduled within 60 days post-publication."
Refinement 1: "expected ~6 weeks" → "scheduled within 60 days" (operational discipline + 14-day margin). Refinement 2: Imenovane konkretne metrike (Pass II rates + p95 latency + recall@K) — vague forward reference izgleda kao vaporware, specifična obećana metrika izgleda kao discipline.
§3 — Marko net evaluation note
PM intencije sve ispravne; tri od četiri framing-a (4, 6, 7) treba da se pomere stepenicu ka aktivnijem, ne dodatak na sadržaj. Cilj nije da paper deluje skromno ili pažljivo — cilj je da deluje tačno.
§4 — Drafting kick-off prerequisites (sve resolved)
- ✅ Title locked
- ✅ Author roster (3-author final)
- ✅ Endorsement path locked (A primary + D fallback)
- ✅ Multiplier framing locked (Negative Result subsection)
- ✅ GEPA scope locked (§5.4 sub-section + companion paper footnote)
- ✅ §5.5 framing locked (active-voice bias-detection guardrails)
- ✅ §5.6 forward reference locked (60-day scheduled + named metrics)
§5 — Posledice za pre-launch sprint i downstream
-
Drafting can start immediately ne blokira Day 0 launch. Sa A+D combination, arxiv timing više nije Day 0 launch dependency — Day 0 može da se ship-uje sa Path D landing implementation, arxiv preprint dolazi kao post-launch news cycle.
-
PM full drafting sequence: Abstract → §1 Intro → §2 Related Work → §3 Architecture → §4 Methodology → §5 Results → §6 Discussion sa Negative Result subsec → §7 Conclusion. 7-9 dana PM autoring time, sledi Marko 1-2 dana review, total ~10 dana to submission.
-
Apps/www CC Sesija D §3 acceptance review treba dobiti Trust Band Card 4 copy swap napomenu ("Open methodology — github docs" replace "Published methodology — arxiv preprint" za Day 0; revertable na arxiv reference posle Path A endorsement).
-
Pavlukhin contact-initiation Marko-side ponedeljak 2026-05-03.
-
Methodology markdown doc skeleton za github post Day 0 launch (PM action item). Završeno 2026-05-02 kao
strategy/methodology/2026-05-02-methodology-doc-FINAL.md(13.2 KB), Marko-side action: copy uwaggle-os/docs/methodology.md+ git commit + push (resolved 2026-05-03 commit87b1637).
§6 — Memory correction (2026-05-02)
Prior memorija project_benchmark_strategy.md LOCK 2026-04-20 atribucija "Pavlukhin = EVOLVESCHEMA author" je CONFIRMED ACCURATE. Prior PM web search miss (arxiv author profile 404 + zero hits) je explained by: EVOLVESCHEMA paper trenutno NIJE na arxiv-u (Marko had PDF locally on 2026-04-20 upload; paper not indexed publicly). Path A action will resolve that — Pavlukhin submits EVOLVESCHEMA standalone arxiv preprint, becomes arxiv author, becomes endorser-eligible.
§7 — Authoring trace
Ova decision memo je autorizovana retroactively 2026-05-05 kao deo pop-up-a četiri-fajla decisions/ folder gap-a koji je flagovan u project_execution_state.md snapshot 2026-05-04. Sadržaj reflektuje point-in-time observation iz project_track_e_arxiv_closed_2026_05_02.md memorije.
Razlog za retroaktivnu autorizaciju: per CLAUDE.md decision memo discipline, svaka LOCKED odluka mora imati matching decisions/<date>-<topic>.md fajl. Memorija postoji ali memorija nije auditable artifact (živi u Cowork space-u, nije u git-u).
END DECISION MEMO.