6.9 KiB
LOCKED Decision — Branch Architecture (Phase 5 Baseline) + Opcija C Ratifikacija
Date: 2026-04-30 Status: LOCKED Author: PM Ratified by: Marko (paste action sequence executed 2026-04-30 morning) Supersedes: none — first formal branch architecture decision Binds: Phase 5 deployment baseline + future cross-stream integration policy
§1 — Discovery (Marko 2026-04-30 morning kickoff)
Tokom Phase 5 §0 preflight setup, otkrivene su tri strukturalne anomalije u repo state-u:
-
Faza 1 manifest v7 SHA terminus iz memorije bio pogrešan. PM (ja) sam u Faza 1 closure decision memo i Phase 5 brief referencirao
fa716ff9kao SHA terminus. Stvarna realnost:fa716ff9ne postoji u.git/objects(fatal: Not a valid object name). Pravi terminus je6bc2089— Checkpoint C closure ("held-out validation 15/15; §F.5 condition_2 — 2/3 PASS, gpt::gen1-v2 OVERFIT exposed"). PM hallucinated SHA bez verifikacije pri zatvaranju Faza 1. -
Faza 1 commits su bili dangling (orphaned). Ceo Faza 1 commit chain (Amendments 7-11 + Checkpoint B + Checkpoint C + bf9219a Gen 1 close) postojao je u
.git/objectsali nije bio reachable iz nijedne grane (lokalne ili remote).git branch --contains 6bc2089vraća prazno output. Garbage collection bi trajno izgubio Faza 1 evidence. Spaseno akcijomgit branch gepa-faza-1 6bc2089. -
Tri paralelna stream-a su divergentna. Pri inspekciji grana otkriveno:
main(origin/main): Sprint 12 Task 1 finalized work (taxonomy + stats + B2 LOCK + smoke). HEAD =5ec069e.feature/c3-v3-wrapper: CC-1 Phase 4 closure. HEAD =c9bda3d(Phase 4.7).gepa-faza-1(novo kreirana): CC-GEPA Faza 1 closure. HEAD =6bc2089(Checkpoint C).- Niko od tri grana nije sadržao oba druga rada. Stream-ovi su radili paralelno bez integration sprint-a posle zatvaranja.
§2 — Decision
Phase 5 baseline = gepa-faza-1 grana (6bc2089). Nova grana phase-5-deployment-v2 kreirana iz gepa-faza-1 kao Phase 5 deployment branch. Stara phase-5-deployment (na Phase 4.7 + 1 forward-port commit ee946d1) obrisana — sadržaj forward-port commit-a već je u Faza 1 grani kao native Amendment 8 commit 4d43141.
phase_5_pre_deployment_sha = 6bc20897d3851072eda34e80070faf39772bee66 (skraćeno 6bc2089).
§3 — Trade-off acknowledgment (Opcija C consequences)
Phase 5 grana inherits:
- Faza 1 manifest v7 + Amendments 1-11 (full GEPA evolution work)
- gen1-v1 shape definicije (claude::gen1-v1, qwen-thinking::gen1-v1)
- registerShape canonical API (Amendment 8 native)
- Checkpoint B + C evaluation infrastructure
- run-checkpoint-c.ts held-out validation runner
Phase 5 grana DOES NOT inherit:
- CC-1 Phase 4 long-task agent fixes (failure classifier, reporting module, messages-array compression, runRetrievalAgentLoopWithRecovery). Ti fix-evi su za production reliability long-task (multi-step research) execution. Phase 5 deployment GEPA-evolved variants su pre svega za simple-medium task profile; long-task fixovi mogu biti merged u Phase 5 granu kasnije ako monitoring (§3 brief) pokaže da je production traffic dominantno long-task.
- Sprint 12 Task 1 main work (benchmark taxonomy + stats infrastructure). To je za benchmark execution, ne za production deployment monitoring.
Mitigation za missing Phase 4 long-task fixes:
- Phase 5 §3 monitoring infrastructure aktivno prati
error_rate(loop_exhausted, timeout, parse_fail). Ako loop_exhausted rate prelazi 5% baseline, halt-and-PM trigger sa "long-task fixes potrebni" rationale. - Selective cherry-pick mogućnost (commits c9bda3d, be8f702, e906114, 4d0542f, 8b8a940 iz Phase 4 chain) ostaje opcija ako monitoring pokaže potrebu.
§4 — Hindsight lessons + future binding
§4.1 — SHA verifikaciona disciplina
Lekcija: Pri zatvaranju Faza 1, PM (ja) je referencirao SHA terminus iz memorije bez git rev-parse ili git log verifikacije. Rezultat: pogrešan SHA propagiran u dva decision memo + Phase 5 brief + memory entry.
Future binding: Bilo koji SHA reference u decision memo, brief, ili memory entry MORA biti verifikovan pre commit-a sa explicit git rev-parse ili git log output zalepljen u audit trail. Forbidden: "from memory" SHA references.
Memory entry: feedback_sha_verification_discipline.md (mirror: D:/Projects/PM-Waggle-OS/memory-mirror/feedback_sha_verification_discipline.md).
§4.2 — Integration sprint policy
Lekcija: Tri paralelna CC stream-a (CC-1 Phase 4 + CC-GEPA Faza 1 + Sprint 12 Task 1) su zatvorena nezavisno bez integration sprint-a. Rezultat: divergent grane, dangling commits, manuelna orchestration potrebna pre Phase 5 deployment.
Future binding: Posle zatvaranja bilo koja dva stream-a koji rade na zajedničkim packages (packages/agent, packages/core), integration sprint je obavezan pre dalje stream-specific rada. Integration sprint deliverables: merge-back u main + cross-stream test harmonizacija + branch hygiene check.
Memory entry: feedback_integration_sprint_policy.md (mirror: D:/Projects/PM-Waggle-OS/memory-mirror/feedback_integration_sprint_policy.md).
§4.3 — Dangling commit hygiene
Lekcija: Faza 1 commits su bili dangling jer grana sa kojom su radjeni nije ostala u repo (verovatno deleted post-merge ili nikad pushed). Bez git branch --contains provere, commits su mogli biti garbage collected.
Future binding: Posle zatvaranja sprint-a sa significant commit chain, kreiraj backup granu (<sprint-name>-archive) kao protection od GC. Jednostavna komanda u session_end_protocol checklist.
§5 — Integration sprint deferred to post-Phase-5 production-stable
Posle Phase 5 production-stable transition (~6-8 nedelja od kick-off-a, per Phase 5 brief §4.3 definicija), zaseban integration sprint:
- Merge
gepa-faza-1(sa Phase 5 production deployments) umain - Merge
feature/c3-v3-wrapper(Phase 4 long-task fixes) umain— ili selective cherry-pick ako Phase 5 monitoring pokaže da nisu potrebni - Resolve merge konflikte u
packages/agent - Cross-stream test harmonizacija (kombinovani test count target)
- Brief + decision memo za integration sprint closure
Prio: medium (ne blokira Phase 5, blokira post-Phase-5 development).
§6 — Audit trail anchors
- Phase 5 baseline grana:
phase-5-deployment-v2(head6bc2089) - Faza 1 archive grana:
gepa-faza-1(head6bc2089, identican sa baseline po definiciji) - Faza 1 closure decision memo:
decisions/2026-04-29-gepa-faza1-results.md(treba SHA fix) - Phase 5 brief:
briefs/2026-04-29-phase-5-deployment-brief-v1.md(treba SHA + branch fix) - Phase 5 brief LOCKED memo:
decisions/2026-04-29-phase-5-brief-LOCKED.md(treba SHA + branch fix) - Phase 5 scope LOCKED memo:
decisions/2026-04-29-phase-5-scope-LOCKED.md(no fix needed) - Stara phase-5-deployment grana: deleted (was
ee946d1, redundant sa4d43141)
End of LOCKED decision. Phase 5 baseline ratifikovano. SHA fix propagacija + brief update u toku.