LOCKED Decision — Phase 5 Deployment Scope
Date: 2026-04-29 Status: LOCKED Author: PM Ratified by: Marko ("da", 2026-04-29) Supersedes: none — first formal Phase 5 scope lock Binds: Phase 5 brief authoring (PM-side, next 4-5 dana wall-clock)
§1 — Decision
Phase 5 deployment obuhvata dva GEPA-evolved variants:
claude::gen1-v1— AUTHORIZED (combined N=13 = 100% Pass II, 0pp held-out gap)qwen-thinking::gen1-v1— AUTHORIZED (Phase 4.5 mechanism CONFIRMED out-of-distribution: retrieval 2.231 = 96% Opus parity, +12.5pp quality, 0pp held-out gap)
gpt::gen1-v2 je WITHHELD iz Phase 5; ulazi u Faza 2 N=16 re-validacioni run pre bilo kakve deploy odluke.
§2 — Rationale (sazeto)
§F.1 (≥+5pp held-out) prosli su sva tri kandidata. §F.5 cond_2 (overfitting bound ±15pp) prosli su samo claude (0pp) i qwen-thinking (0pp); gpt FAIL sa 20pp gap (in-sample +25pp -> held-out +5pp). To znaci da je gpt rezultat selection-biased na in-sample distribuciji i da bi deployment na inflated effect-size estimatu bio metodoloska greska. Held-out validation methodology je upravo i autorizovana da uhvati ovakve slucajeve — radi kako je dizajnirana.
Cuvanje pre-registration discipline kroz 11 amendments imalo bi smisla samo ako rezultate primenjujemo konzistentno: bind kada trigger fire na mehanizmu, ne kada je trigger detection pod selection bias-om. Phase 5 zato deploy-uje samo robustno validirane variante.
§3 — Strategic implications
KVARK enterprise pitch anchor sada dobija oba primary use case scientific support:
- Claude flagship-class continuity (claude::gen1-v1)
- On-prem Qwen 35B = Opus-class out-of-distribution (qwen-thinking::gen1-v1, 96% Opus retrieval parity)
arxiv §5 evidence je publishable: cross-family generalization sa transparentnom selection bias scoping discussion (gpt) kao methodology demonstration, ne failure disclosure.
Faza 2 sprint planning dobija jasan primary scope: gpt::gen1-v2 N=16 re-validacija sa selection bias resolution kao explicit cilj.
§4 — Phase 5 brief delivery commitments (PM-side)
PM (ja) ce drafting Phase 5 brief obuhvatiti:
- Deployment plan — kako se claude::gen1-v1 i qwen-thinking::gen1-v1 apply-uju u repo, koja je rollback procedura, koji canary uslov pre full enable
- Monitoring infrastructure — koje metrike se prate (Pass II, retrieval engagement, latency, cost), threshold alerts, observation window
- Pre-registered exit criteria — kada Phase 5 prelazi u "production-stable" status, kada eskalira u rollback
- Cost projection — bind na real model pricing × max_tokens × probe-validated per-instance cost (per feedback_cost_projection_real_anchoring rule)
- Cross-stream dependencies — Landing v2 refinement trigger (Proof Card 1 swap), arxiv §5 timing, KVARK pitch readiness
ETA brief land: 4-5 dana wall-clock from 2026-04-29 evening start.
Trigger condition za actual deployment kick-off: Marko ratifikacija drafted brief-a + canary readiness verifikacija.
§5 — Audit trail anchors
- Faza 1 closure decision memo:
decisions/2026-04-29-gepa-faza1-results.md(568 linija) - Faza 1 acceptance verdicts: §F.1-F.5 + cond_2 dokumentovani u closure memo §B-C
- Cumulative Faza 1 spend: $43.49 / $115 cap (headroom $71.51 za Faza 2)
- Memory entries:
project_gepa_faza1_closed_2026_04_29+project_sprint_2026_04_28_master - Handoff:
sessions/2026-04-29-handoff-faza1-closed-landing-parked.md
End of LOCKED decision.