2.0 KiB
2.0 KiB
LOCKED — Gate D Deviation Adjudication Option A Ratified
Date: 2026-04-24 Ratified by: Marko Marković PM: claude-opus-4-7 (Cowork)
Odluka
Option A ACCEPT — Gemini 3.1 Pro Tier 2 upgrade kao primary resolution za Gate D deviation halt. Manifest v4 anchor dedd698 ostaje validan ex-ante lock. Code freeze HEAD 373516c nepromenjen.
Uslovi
Tri blocker prerequisites pre N=400 re-kick-a ratifikovani kao non-negotiable:
- Lock semantics clarification memo (Path L-1 preferred, L-2 fallback sa manifest v5 trigger)
- Runner early-exit RCA memo (tech-debt preferred, patch-required triggers manifest v5)
- Gate P+ pre-flight probe (50 Gemini calls u 30s, 0 × 429 required)
Sva tri moraju biti PM-ratifikovana pre re-kick autorizacije.
Billing state
- Account: Egzakta (ID 01DBA5-921E58-9DAF46)
- Tier: Tier 2 LIVE 2026-04-24
- Credit balance: $63.20
- Visa ending 7475, postpay mode
Odbačene opcije
- C (judge swap) → §5.2 break
- D (token-bucket limiter) → code-freeze break
- E (Promise.allSettled + quorum) → code-freeze + §5.2 break
- G (no-op) → bad EV
Fallback
- Option B (manifest v5, concurrency=1, ~16h wall-clock) ako bilo koji prerequisite pokrene manifest v5 trigger
- Option F (stop at Gate C, publish sa caveats) kao last-resort
Carry-over
Task 2.6 entries:
- Subject-only per-cell budget gap (
runner.ts:396,line 428) - Judge-ensemble defensive error handling (Promise.allSettled + quorum, ako RCA potvrdi "isključivo 429")
- Runner-lock race permanent fix (ako §1.1 Path L-1 prođe waiver)
- Gate P+ probe template (reusable pre-flight check)
Reference
- Brief:
briefs/2026-04-24-cc-task25-stage3-rekick-option-a.md - Deviation halt:
sessions/2026-04-24-task25-stage3-n400-deviation-halt.md - Manifest v4 MD:
D:\Projects\waggle-os\benchmarks\results\manifest-v4-preregistration.md - Manifest v4 YAML:
D:\Projects\waggle-os\benchmarks\results\manifest-v4-preregistration.yaml