CC Brief — Phase 5 Deployment (GEPA-evolved variants)

Brief ID: phase-5-deployment-v1 Author: PM Date: 2026-04-29 Status: LOCKED 2026-04-29 — Marko ratifikovao "sve ok idemo dalje" Ratification timestamp: 2026-04-29 (PM session) Scope LOCK upstream: decisions/2026-04-29-phase-5-scope-LOCKED.md Faza 1 closure upstream: decisions/2026-04-29-gepa-faza1-results.md Manifest v7 SHA terminus upstream: 6bc2089 (Faza 1 Checkpoint C closure; verified 2026-04-30 via git rev-parse 6bc2089) Phase 5 deployment branch: phase-5-deployment-v2 (created from gepa-faza-1 2026-04-30; replaces deleted phase-5-deployment per Opcija C decision) Branch architecture decision: decisions/2026-04-30-branch-architecture-opcija-c.md (Opcija C ratifikacija — Phase 5 inherits Faza 1 work, NE Phase 4 long-task fixes; mitigation via §3 monitoring + selective cherry-pick option) Cost ceiling: $75 hard cap, $60 halt trigger, $35-45 expected (AMENDED 2026-04-30 per decisions/2026-04-30-phase-5-cost-amendment-LOCKED.md based on §0.3 probe-validated reality $38.34; original v1: $25/$20/$8-12 superseded) Wall-clock projection (NOT trigger): 2-4 dana wall-clock za CC implementation; canary observation window minimum 7 kalendarskih dana AND minimum 30 evaluation samples per variant per metric (oba uslova moraju da budu zadovoljena pre full enable; effective wall-clock floor je max(time_to_reach_7_days, time_to_reach_30_samples))


§0 — Pre-flight gates (BLOCKING — must PASS before §2)

Ovaj odeljak postavlja kanonski substrate-readiness, config-inheritance, cost-projection i deployment-readiness checklist koji CC mora prosledi pre bilo kakvog deploy artifacta. Svaki gate emituje PASS ili FAIL sa eksplicitnom evidencijom commit-ovanim u gepa-phase-5/preflight-evidence.md. Bilo koji FAIL → halt-and-PM, ne self-advance.

§0.1 — Substrate readiness grep (BLOCKING)

CC mora dokumentovati sledeću evidenciju sa eksplicitnim file:line citacijama:

  1. REGISTRY u packages/agent/src/prompt-shapes/selector.ts mora sadržati base shapes claude, qwen-thinking, qwen-non-thinking, gpt. Phase 5 NE menja base shapes; dodaje ima-prostora-prefiks varijante preko registerShape(name, shape) kanonskog API-ja (per feedback_external_contract_validation rule + Faza 1 Amendment 8 ESM module-identity discovery).

  2. registerShape kanonski API mora biti exportovan iz selector.ts i preko barel index.ts (pod-rule iz Amendment 8: dual-repo fix). Direct (REGISTRY as any)['gen1-v1'] mutation je forbidden; mora ići preko registerShape('claude::gen1-v1', shape).

  3. Na origin/main HEAD mora biti 265/265 ili noviji test broj passing. Pre Phase 5 deployment grane CC pokreće git rev-parse HEAD i full test suite, beleži rezultat u preflight-evidence.

  4. Manifest v7 (gepa-phase-5/manifest.yaml koji CC autorizuje u §1) mora referencirati Faza 1 closure SHA terminus 6bc2089. Ako HEAD ode dalje pre Phase 5 kick-off, CC mora reachability-proverkom (git merge-base --is-ancestor 6bc2089 HEAD) potvrditi da je Faza 1 commit-chain još intact.

  5. CC mora grep-om dokazati da nema orphaned references na gpt::gen1-v2 u deployment artifactsima Phase 5 (per scope LOCK: gpt withheld). Allowed reference samo u §8 audit anchors kao "deferred Faza 2".

Gate verdict: §0.1 PASS samo ako svih 5 stavki ima eksplicitnu file:line evidenciju + git output.

§0.2 — Config inheritance audit (BLOCKING)

Phase 5 nasleđuje od Faza 1 manifest v7, ali task-type je drugačiji (Phase 5 = production deployment + monitoring; Faza 1 = evolution + held-out validation). Per feedback_config_inheritance_audit rule, CC mora explicit emitovati config differential block u preflight-evidence:

Field Faza 1 manifest v7 value Phase 5 manifest value Justification ako se razlikuje
temperature (faza 1 evolution-time setting) (production setting) production usually lower variance
max_tokens (faza 1 setting) (production setting) should align with retrieval engagement Phase 4.5 finding
judge_model_primary MiniMax M2.7 (production: same? deferred?) cost vs quality trade-off
evaluation_corpus_source Phase 4.5 + Checkpoint C held-out Production traffic (live) inherent task-type shift
failure_mode_taxonomy Faza 1 Amendment 4 texture audit Production rollback triggers new mapping required
cost_per_request_baseline Probe-validated Faza 1 Probe-validated Phase 5 (re-probe) cost may shift sa production load patterns

Gate verdict: §0.2 PASS samo ako svih 6 row-ova ima explicit value + justification commentar. Implicit defaults forbidden.

§0.3 — Cost projection probe (BLOCKING — per feedback_cost_projection_real_anchoring rule)

CC mora pre Phase 5 deployment kick-off-a izvršiti 3-element decomposition probe sa real model pricing × volume estimate × per-request cost:

  1. Model pricing snapshot — Anthropic Opus 4.7 input/output rates (current 2026-04-29) za claude::gen1-v1 deployment; DashScope Qwen 35B-A3B rates za qwen-thinking::gen1-v1. Citira pricing source (URL ili docs reference) sa snapshot timestamp.

  2. Volume estimate — canary phase volume target (recommendation: 50 requests / day za prvih 5 dana × 2 variants = 500 total requests canary phase). Production volume target: TBD pre full enable, kao deo §4 exit criteria.

  3. Per-request probe — CC pokreće 5-request probe na svaki variant pre full canary, beleži probe_per_request_cost_p50, probe_per_request_cost_p95, probe_per_request_cost_max. Probe sample mora biti reprezentativan (varying complexity, ne sve trivialne queries).

  4. Cost projection emission — formula:

    canary_cost_estimate = volume_target × probe_p50 × 1.20  (+20% buffer)
    canary_cost_p95_ceiling = volume_target × probe_p95 × 1.20
    
  5. Ceiling validationcanary_cost_p95_ceiling ≤ $20 mora držati. Ako ne, halt-and-PM za scope re-evaluation (smanji volume target ili pivot variant priority).

Gate verdict: §0.3 PASS samo ako su sve 5 stavki dokumentovane sa numerical evidence; pricing snapshot URL + timestamp; probe outputs commit-ovani.

§0.4 — Deployment readiness checklist (BLOCKING)

Pre §2 deployment, CC mora potvrdi:

  1. Rollback SHA pinned — pre kick-off-a CC zapisuje git rev-parse HEAD kao phase_5_pre_deployment_sha u manifest. Bilo koji rollback ide preko git revert ili git reset --hard ka tom SHA. Forbidden: rollback preko in-place file overwrites.

  2. Monitoring infrastructure live — §3 monitoring metrics moraju biti emitovane (basic stub-ovi OK ali ne smeju biti no-op) pre canary kick-off-a. CC mora pokazati da Pass II rate, retrieval engagement, latency p50/p95, cost per request outputi postoje u JSONL log lokaciji koju §3 specifikuje.

  3. Canary toggle mechanism — feature flag ili env var koji omogućava gradual rollout (npr. WAGGLE_PHASE5_CANARY_PCT=10 što znači 10% production traffica routed kroz GEPA-evolved variants, ostatak na pre-Phase-5 baseline). CC pokazuje implementation u kodu + dokazuje da se toggle može flip-ovati bez redeploy.

  4. Pre-registered exit criteria locked — §4 mora biti commit-ovan pre canary kick-off-a. Bilo koja mid-flight izmena zahteva amendment + Marko ratifikaciju (per feedback_substrate_readiness_gate discipline).

  5. Halt-and-PM triggers active — §3 threshold alerts moraju biti wired tako da automatski emit halt request ako bilo koji rollback trigger fire. Forbidden: silent degradation.

Gate verdict: §0.4 PASS samo ako svih 5 stavki ima evidence + functional verification (ne samo "code present").

§0 verdict aggregation

Sva 4 sub-gate-a moraju emitovati PASS pre nego što CC krene u §2. Aggregation:

§0_verdict = §0.1 AND §0.2 AND §0.3 AND §0.4

Bilo koji FAIL → halt-and-PM sa preflight-evidence commit + explicit FAIL reason u commit message.


§1 — Scope declaration (LOCKED)

Phase 5 deployment obuhvata dva GEPA-evolved varianta:

  1. claude::gen1-v1 — produkt Faza 1 Gen 1 evolution-a. Substrate evidence: 100% Pass II combined N=13 (8 in-sample + 5 held-out), 0pp held-out gap, +12.5pp Pass II vs claude::base na in-sample. §F.5 cond_2 overfitting bound check: PASS (0pp gap < ±15pp bound).

  2. qwen-thinking::gen1-v1 — produkt Faza 1 Gen 1 evolution-a. Substrate evidence: retrieval engagement 2.231 = 96% Opus parity 2.33, +12.5pp Pass II quality on N=13, 0pp held-out gap. Phase 4.5 mechanism CONFIRMED out-of-distribution (Faza 1 closure §F.5 cond_2 verdict). To je ključan KVARK enterprise pitch scientific anchor i arxiv §5 evidence.

Withheld iz Phase 5:

  • gpt::gen1-v2 — selection-biased na in-sample (in-sample +25pp → held-out +5pp = 20pp gap > ±15pp overfitting bound). WITHHELD do Faza 2 N=16 re-validacioni run. Methodology working as designed (held-out exposed bias pre deployment), ne failure.

Authorities:

  • Scope ratifikovan Marko 2026-04-29 ("da") na PM predlog decisions/2026-04-29-phase-5-scope-LOCKED.md.
  • Audit chain: decisions/2026-04-29-gepa-faza1-results.md § B-C verdict tabele + manifest v7 SHA terminus 6bc2089.

No-substitution rule: Bilo koja izmena Phase 5 scope-a (dodavanje gpt, swap variants, drugi Generation) zahteva novi LOCKED decision memo + Marko ratifikaciju. CC mora halt-and-PM ako mid-flight discovery sugeriše scope changes.


§2 — Deployment plan

§2.1 — Canary phase

CC implementira canary toggle (per §0.4 #3) sa gradient rollout:

  1. Day 0 (kick-off): canary_pct = 10% za oba varianta paralelno. Observation window 24h pre incrementa.
  2. Day 1-2 (assuming no rollback trigger): canary_pct = 25%. Observation 48h.
  3. Day 3-5 (assuming no rollback trigger): canary_pct = 50%. Observation 72h.
  4. Day 5+ (assuming all §4 promotion criteria met): full enable kandidat (vidi §2.2).

Tokom canary, baseline (pre-Phase-5) variants ostaju active na komplementarnom % traffic-a. To omogućava A/B paired comparison u §3 monitoring.

§2.2 — Full enable trigger

Full enable (canary_pct = 100%) može krenuti samo ako sva tri uslova drže paralelno:

  1. Svi §4.1 promotion criteria PASS-uju per pre-registered thresholds.
  2. Prošlo je ≥7 kalendarskih dana od canary kick-off-a.
  3. Akumulirano je ≥30 evaluation samples per variant per metric.

Effective wall-clock floor je max(7_days_floor, 30_samples_floor) — whichever uslov je sporiji da se zadovolji odredjuje promociju. Sample floor je hard guard protiv small-sample-effect stage promotion (npr. ako traffic je nizak i 30 samples zahteva 12 dana, čeka se 12 dana, ne 7).

§2.3 — Rollback procedura

Trigger uslovi za rollback definisani u §4. Procedura:

  1. CC ili automation emit ROLLBACK_REQUESTED log entry sa trigger_reason field.
  2. CC izvršava git checkout phase_5_pre_deployment_sha -- <variant_files> ili git revert <deployment_commit_sha> (whichever primenjivo).
  3. CC verifikuje git diff phase_5_pre_deployment_sha HEAD returns empty na variant files.
  4. CC re-runs full test suite, mora biti 265/265 ili više passing.
  5. CC commit-uje rollback sa [ROLLBACK] Phase 5 — <variant> — <trigger_reason> message.
  6. CC emit halt-and-PM sa rollback evidence link.
  7. PM (Marko + ja) decide naredne korake (re-attempt sa amendment, abandon variant, escalate to Faza 2 redo).

No silent rollback. Sve rollback events ulaze u gepa-phase-5/rollback-log.jsonl.


§3 — Monitoring infrastructure

CC implementira monitoring koji emit-uje sledeće metrike u JSONL log u gepa-phase-5/monitoring/<ISO_date>/<variant>.jsonl. Svaki entry: {ts, variant, request_id, metric_name, metric_value, baseline_comparison?}.

§3.1 — Required metrics

  1. Pass II rate — moving 10-sample window per variant. Threshold alert ako variant_pass2 < baseline_pass2 - 5pp (consecutive 2 windows).

  2. Retrieval engagement — per-request retrieval call count + retrieval depth. Threshold alert ako variant_retrieval < baseline_retrieval × 0.80 (consecutive 3 windows). Phase 4.5 mechanism baseline reference: qwen-thinking::gen1-v1 ima 2.231 retrieval mean (Faza 1 evidence).

  3. Latency p50, p95 — per-request wall-clock. Threshold alert ako variant_p95 > baseline_p95 × 1.50.

  4. Cost per request — per-request USD ceiling. Threshold alert ako rolling 24h variant_cost > baseline_cost × 1.30.

  5. Error rate — per-variant agent_error_rate (loop_exhausted, timeout, parse_fail, other). Threshold alert ako variant_error > baseline_error + 3pp (consecutive 24h).

§3.2 — Threshold alert routing

Svaki threshold alert emit-uje THRESHOLD_BREACH log entry + writes phase-5-alerts/<ISO_date>.jsonl. Ako alert je rollback-trigger (§4), automation poziva §2.3 rollback proceduru.

§3.3 — Observation cadence

PM-side reading cadence: 1× dnevno tokom canary phase prvih 5 dana, zatim 2× nedeljno. CC scheduled task emit-uje daily summary u phase-5-daily-summary/<ISO_date>.md sa key metric snapshot + alert log.

§3.4 — Dashboard reference

Stage 1 implementation: JSONL fajlovi + daily markdown summary (no UI). Stage 2 (deferred, post-launch): dashboard u admin-web ako bandwidth dozvoli.


§4 — Pre-registered exit criteria (BIND)

Sledeći thresholdi su pre-registrovani i ne mogu biti revisited mid-flight bez amendment + PM ratifikacije.

§4.1 — Promotion criteria (canary → full enable)

Variant prelazi u full enable status ako svih 5 uslova PASS-uju:

  1. Pass II rate ≥ baseline + 0pp ε (per feedback_epsilon_inclusive_boundary rule, ε = 1e-9). Cilj: regression-free promotion. Stretch goal +5pp ali ne blok.

  2. Retrieval engagement: variant ≥ baseline × 0.80 za qwen-thinking; variant ≥ baseline za claude. Differential rationale: qwen-thinking je Phase 4.5 mechanism-validated retrieval-driver, baseline reference je relevant; claude::gen1-v1 evolution drugog tipa.

  3. Latency p95: variant ≤ baseline × 1.20 (acceptable variance bandwidth).

  4. Cost per request: variant ≤ baseline × 1.15 (per real-anchored projection rule).

  5. Error rate: variant ≤ baseline + 1pp (regression-free error budget).

Wall-clock floor: min(7 dana since canary kick-off, ≥30 samples per metric).

§4.2 — Rollback triggers (immediate)

Bilo koji od sledećih → automatski rollback per §2.3:

  1. Pass II rate: variant < baseline 10pp (consecutive 2 windows of 10-sample each).
  2. Error rate: variant > baseline + 5pp (consecutive 24h).
  3. Cost per request: variant > baseline × 2.0 (immediate, single-window).
  4. Latency p95: variant > baseline × 3.0 (immediate, single-window).
  5. Manual halt-and-PM trigger ako Marko ili PM observe anomaly van threshold-a.

§4.3 — Production-stable definition

Variant achieve-uje "production-stable" status ako po full enable:

  1. 30 dana zero rollback events.
  2. All 5 §4.1 metrics maintained within pass bands.
  3. Zero halt-and-PM trigger emissions.

Production-stable status unblock-uje §6 cross-stream dependencies (Landing v2 swap, arxiv §5 evidence push, KVARK pitch deck integration).

§4.4 — No-revisit-without-amendment binding

Sve §4.1, §4.2, §4.3 thresholdi su LOCKED. Ako tokom Phase 5 CC discover-uje da neki threshold treba relaxation ili tightening, halt-and-PM proceduru sa amendment proposal. Marko ratifikuje, novi LOCKED memo, restart canary phase ako threshold change znači redo. Per Faza 1 Amendment 11 terminal_calibration_clause precedent.


§5 — Cost projection (real-anchored)

Per feedback_cost_projection_real_anchoring rule, sledeća projekcija je three-element decomposition. Sve brojke su projection do §0.3 probe-validation; CC overrides ovu sekciju sa probe-actuals u preflight-evidence.

§5.1 — Model pricing reference (snapshot 2026-04-29)

Model Input $/1M tokens Output $/1M tokens Source
Anthropic Opus 4.7 (claude::gen1-v1 deployment) TBD-PROBE TBD-PROBE docs.anthropic.com/pricing — CC fetches current at §0.3
DashScope Qwen 35B-A3B (qwen-thinking::gen1-v1) TBD-PROBE TBD-PROBE dashscope.aliyun.com/pricing — CC fetches current at §0.3

CC mora uneti current pricing u §5.1 tabelu sa snapshot timestamp pre nego što proceed-uje.

§5.2 — Volume estimate

Canary phase total volume target:

  • Day 0-1 (10% canary): ~10 requests/dan × 2 variants × 2 dana = 40 requests
  • Day 1-3 (25% canary): ~25 requests/dan × 2 variants × 2 dana = 100 requests
  • Day 3-5 (50% canary): ~50 requests/dan × 2 variants × 2 dana = 200 requests
  • Day 5+ (100% if promoted): ~100 requests/dan × 2 variants × 2 dana initial = 400 requests
  • Canary phase total (Day 0-7): ~740 requests across both variants

Production sustained volume (Day 7+): TBD na osnovu actual traffic patterns; re-projected u §4.3 production-stable transition memo.

§5.3 — Per-request probe-validated cost

CC izvršava §0.3 probe (5 requests per variant) i emit-uje:

claude::gen1-v1 probe_per_request_cost_p50 = $X.XX  (TBD)
claude::gen1-v1 probe_per_request_cost_p95 = $X.XX  (TBD)
qwen-thinking::gen1-v1 probe_per_request_cost_p50 = $X.XX  (TBD)
qwen-thinking::gen1-v1 probe_per_request_cost_p95 = $X.XX  (TBD)

§5.4 — Phase 5 cost ceiling computation

canary_cost_p50_estimate  = 740 × max(claude_p50, qwen_thinking_p50) × 1.20
canary_cost_p95_ceiling   = 740 × max(claude_p95, qwen_thinking_p95) × 1.20
hard_cap                  = $25
halt_trigger              = $20

CC validates canary_cost_p95_ceiling ≤ $20 u §0.3. Ako prelazi, halt-and-PM za scope re-evaluation.

§5.5 — Total Phase 5 budget allocation

Item USD (projected)
§0.3 probe (10 requests total) $0.30-0.50
Canary phase (Day 0-7) $5-10
Monitoring infrastructure overhead ~$0 (logging)
Daily summary CC emissions (~7 dana × $0.05) $0.35
Buffer (unforeseen probes, reproduction runs) $2-3
Phase 5 Stage 1 expected total $8-13
Hard cap $25

Cumulative project-wide spend after Phase 5: ~$52-57 of theoretical $115 cap (Faza 1 cap; Phase 5 ima nezavisan budget but track aggregation za Faza 2 headroom forecasting).


§6 — Cross-stream dependencies

Phase 5 production-stable status (§4.3) je trigger za sledeće downstream akcije:

§6.1 — Landing v2 Proof Card 1 swap

Per project_landing_v2_basics_2026_04_28 return triggers (12 dokumentovanih), Phase 5 brojevi su highest-probability prvi trigger za Landing iteration:

  • Trigger condition: Phase 5 produce production-stable Pass II numbers + retrieval engagement validated samples.
  • Action: Update Landing v2.3 Proof Card 1 sa PROVENANCE → BENCHMARK swap (concrete numbers from Phase 5).
  • Owner: PM autoring Landing v2.4 brief, claude.ai/design generation.
  • Timing: 2-3 nedelje post Phase 5 production-stable transition.

§6.2 — arxiv §5 evidence integration

Faza 1 §5 evidence + Phase 5 production-stable validation = arxiv §5 publishable narrative:

  • §5.1 — Methodology (manifest v7 + 11 amendments transparent narrative).
  • §5.2 — Faza 1 results (cross-family generalization, claude + qwen-thinking pass; gpt selection bias scoping).
  • §5.3 — Phase 5 production validation (out-of-sample Pass II from real traffic).
  • §5.4 — Scoping discussion (4 methodological findings already documented).

Trigger: Phase 5 production-stable + Marko ratifikacija arxiv co-author roster + endorsement contact.

§6.3 — KVARK enterprise pitch deck

Qwen 35B = Opus-class on Phase 5 production traffic = KVARK pitch deck scientific anchor (already arxiv §5.3 evidence). Pitch deck section: "On-prem Qwen + Waggle harness validated Opus-class on real production traffic, X% retrieval parity, Y% Pass II floor."

Trigger: Phase 5 production-stable + Marko approval pitch deck draft.

§6.4 — Faza 2 sprint planning

Phase 5 production-stable status + 2 weeks observation = Faza 2 sprint kick-off window. Faza 2 scope:

  • gpt::gen1-v2 N=16 re-validation (selection bias resolution).
  • qwen-non-thinking deeper investigation (retrieval-quality decoupling characterization).
  • generic-simple investigation (necessary-but-not-sufficient retrieval scoping).
  • arxiv §5.4 finalization.

Budget headroom: $71.51 (Faza 1 unspent of $115 cap).


§7 — Decision points

§7.1 — Marko ratifikacija drafted brief

Trigger: PM (ja) emit-ujem v1 brief Marku za critique. Action: Marko provides critique → PM revisions → v2 → ratification. Outcome: ratified brief unblocks §0 preflight gates execution.

§7.2 — PM signoff on §0 preflight evidence

Trigger: CC emit-uje §0 preflight-evidence sa svih 4 sub-gates PASS. Action: PM (ja) verify evidence completeness, request additional grep ako needed. Outcome: PM emit "preflight ratified" → CC unblock-uje §2 deployment.

§7.3 — Canary kick-off trigger

Trigger: §0 PASS + §1-§5 CC implementation complete + §3 monitoring stub functional. Action: CC emit-uje canary kick-off intent + Marko ratifikuje + canary toggle flip-uje na 10%. Outcome: Phase 5 LIVE in canary mode.

§7.4 — Rollback authority

Anyone can trigger rollback bez post-hoc justification:

  • §4.2 automatic triggers (no human approval needed, immediate execution).
  • PM (ja) ili Marko manual halt-and-PM (full discretion).
  • CC observed anomaly outside pre-registered thresholds (CC emit-uje halt request, PM ratifies rollback).

Post-rollback, decision authority on next steps (re-attempt, abandon, escalate Faza 2): PM proposal + Marko ratifikacija.

§7.5 — Faza 2 sprint planning gate

Trigger: Phase 5 production-stable status (§4.3) + 2 weeks observation. Action: PM brief autoring za Faza 2 sprint. Outcome: Faza 2 sprint kick-off (likely 2026-06-XX timeframe).


§8 — Audit trail anchors

§8.1 — Upstream LOCKED decisions

  • decisions/2026-04-29-phase-5-scope-LOCKED.md — Phase 5 scope LOCK (this brief implements)
  • decisions/2026-04-29-gepa-faza1-results.md — Faza 1 closure (568 linija, §A-G structured)
  • sessions/2026-04-29-handoff-faza1-closed-landing-parked.md — handoff state at brief autoring time

§8.2 — Faza 1 manifest chain SHA terminus

6bc2089 — final SHA after 11 amendments. CC verifies reachability via git merge-base --is-ancestor 6bc2089 HEAD per §0.1 #4.

§8.3 — Binding feedback rules applied

  • feedback_epsilon_inclusive_boundary — §4.1 #1 ε = 1e-9 inclusive boundary applied
  • feedback_external_contract_validation — §0.1 #2 registerShape canonical API enforced
  • feedback_cost_projection_real_anchoring — §5 three-element decomposition + probe-validation
  • feedback_latent_bug_unused_parameter — N/A za Phase 5 brief but applies to CC implementation
  • feedback_substrate_readiness_gate — §0 grep evidence binding before §2 deployment
  • feedback_config_inheritance_audit — §0.2 explicit differential block, no implicit defaults
  • feedback_brief_wall_clock_discipline — wall-clock 2-4 dana labelled "projection NOT trigger"

§8.4 — Reference to Faza 1 amendments precedent

11 amendments to manifest v7 form precedent za:

  • Pre-registration discipline (Amendments 7, 11 calibration clauses)
  • Halt-and-PM cascade (4 false-positive averts documented)
  • Held-out validation methodology (gpt selection bias caught by held-out, not bug)
  • Cross-module-boundary regression test (Amendment 8 ESM module-identity hazard)

Phase 5 inherits ovu disciplinu. Bilo koji mid-flight discovery → halt-and-PM, ne self-advance.


§9 — Brief versioning

  • v1 — 2026-04-29 — PM initial draft + 1 QA pass (min/max canary floor logical bug fix u §2.2 i header)
  • LOCKED 2026-04-29 — Marko ratifikovao bez critique items ("sve ok idemo dalje"); v1 immutable, drives CC execution

Trigger condition za actual CC execution: CC fresh sesija sa brief load + §0 preflight kick-off + cost probe authorization.

Amendment policy post-LOCK: sve mid-flight discoveries → halt-and-PM, nikako self-advance. Per Faza 1 Amendment 11 terminal_calibration_clause precedent.


End of LOCKED brief. Ready for CC handoff.