7.7 KiB
CC-1 — Day 2 AM Kickoff Brief
Datum: 2026-04-22 PM (issued for 2026-04-23 AM start) Sprint: 11 · Pre-flight readiness Day 1 close: 3/10 exit kriterijuma CLOSED (A1, B1, C1) Day 2 ceiling: $0.30 ukupno · hard alarm 130% = $0.39 Owner: CC-1 PM: Marko + Cowork
Šta tražim
Tri zadatka paralelno u Day 2 AM (A2 + B2 + B3). Svi su unblocked. Day 1 ratifikacioni gateway je prošao 2026-04-22 EOD; sve PM LOCK odluke su zaključane i referencirane dole.
Task A2 — reasoning_content capture (harness only)
Scope: SAMO reasoning_content extraction po design doc §6 (7 koraka). turnId plumbing je već LIVE na HEAD e1ae0a4 (≥50 hits, 9 fajlova) — NE re-implementiraj generator ni threading.
Authoritative dokumenti:
- Design doc:
D:\Projects\waggle-os\docs\plans\H-AUDIT-1-DESIGN-DOC-2026-04-22.md(commit008deac) - PM ratifikacija sa 5 odgovorenih open questions:
D:\Projects\PM-Waggle-OS\decisions\2026-04-22-h-audit-1-design-ratified.md
Eksplicitne odluke iz ratifikacije (mora se poštovati):
- Parser precedence — DUAL-SHAPE, redom:
body.choices?.[0]?.message?.reasoning_content(DashScope native primary)body.choices?.[0]?.message?.reasoning(OpenRouter unified, current bridge)body.reasoning_content(legacy fallback)
- Observability:
llm.responsepino event MORA imatireasoningShape: 'message.reasoning_content' | 'message.reasoning' | 'body.reasoning_content' | 'unknown'. Emitreasoning_content_shape_unknownwarning ako thinking=true a nijedan shape nije present (no throw). - Persistence: isti JSONL row, net-new fields
reasoning_content+reasoning_content_charsnaJsonlRecord. Read-path pruning krozreadJsonl(path, { includeReasoning: false }). Write-path uvek full. - Retention: Tier 1 sprint-internal probes pruned at sprint close (gitignored
benchmarks/results/). Tier 2 launch-claim runs (H-42a/b) gzipped tobenchmarks/archive/*.jsonl.gz, 12mo minimum.
HARD STOP signali (anti-patterns §7 design doc-a):
- Ne dirati turnId generator (
turn-context.ts:29 generateTurnId()). - Reasoning_content NIKAD u frames / memory / KG / UI / MCP payload.
- Reasoning_content NIKAD u judge prompt (invalidira Sprint 10 Task 2.2 Fleiss' κ=0.8784 lock).
Budget: $0
Exit ping: D:\Projects\PM-Waggle-OS\sessions\2026-04-22-sprint-11-h-audit-1-exit.md
CLOSE kriterijum: §4 design doc rows 4–7 green (rows 1–3 već green na HEAD).
Task B2 — Tie-break policy implementacija
⚠️ VENDOR SWAP DELTA vs originalni Sprint 11 brief §3 B2:
Originalna verzija je navela claude-sonnet-4-6 kao fourth vendor. Marko je 2026-04-22 LOCKED zamenu na xai/grok-4.20.
Authoritative LOCK dokument (mora pročitati pre koda):
D:\Projects\PM-Waggle-OS\decisions\2026-04-22-tie-break-policy-locked.md
Konkretna implementacija:
- Novi fajl:
packages/server/src/benchmarks/judge/ensemble-tiebreak.ts - Interface:
resolveTieBreak(votes: Vote[]): TieBreakResultgde:type TieBreakResult = { verdict: string; path: 'majority' | 'quadri-vendor' | 'pm-escalation'; votes: Vote[]; }; - Quadri-vendor branch: poziva
xai/grok-4.20(LiteLLM route). NE Sonnet 4.6, NE Opus 4.7, NE Grok 4.3 Beta. - xAI infra:
XAI_API_KEY(84 chars) live uD:\Projects\waggle-os\.env. Routexai/grok-4.20već wired ulitellm-config.yaml(od PA v5, 2026-04-17). Nula nove infrastrukture. - 4 unit testa:
1-1-1split → trigger quadri-vendor call naxai/grok-4.20, verifikuj system prompt + rubric payload1-1-2split → already majority, no tiebreak call2-1-1split → majority wins, no tiebreak call3-0consensus → trivial verdict, no tiebreak call
- Observability: pino log polja
tie_break.path∈{none, majority, quadri-vendor, pm-escalation}+tie_break.fourth_vendor_slug(uvekgrok-4.20u Sprint 11 scope-u, ali field future-proof). - Integracija: u postojeći ensemble orchestration path (Sprint 10 Task 2.2 ratified ensemble: Opus 4.7 + GPT-5.4 + Gemini 3.1).
HARD STOP:
- Ne predlaži Opus 4.7 kao tie-break (već je Judge 1).
- Ne predlaži Sonnet 4.6 (vraća na 2-Anthropic problem, suprotno od Sprint 10 multi-vendor odluke).
- Ne predlaži Grok 4.3 Beta (locked iza SuperGrok Heavy $300/mo, nije na našem tier-u).
Budget cap: $0.20 za grok-4.20 calls u unit testu (xAI pricing comparable Anthropic Sonnet, no cost surprise).
Wall-clock: 2-3h
Exit ping: D:\Projects\PM-Waggle-OS\sessions\2026-04-22-sprint-11-b2-tiebreak-exit.md sa: commit hash, test results (4/4 expected green), pino log sample sa tie_break.* fields, jedan example actual quadri-vendor call cost.
Task B3 — Opus 4.6 route audit
Scope: klasifikuj sve reference na claude-opus / claude-sonnet model snapshotove i alias-e u kodu, izveštaj sa preporukom za naming convention LOCK.
Konkretni koraci:
grep -rn "claude-opus\|claude-sonnet-4" packages/server/ packages/cli/- Za svaku referencu klasifikuj:
- (a) dated snapshot (npr.
claude-opus-4-6-20251014,claude-opus-4-7-20260201) - (b) floating alias (npr.
claude-opus-4-6,claude-opus-4-7) - (c) provider-prefixed (npr.
anthropic/claude-opus-4-7)
- (a) dated snapshot (npr.
- Output report fajl:
D:\Projects\waggle-os\docs\reports\opus-4-6-route-audit-2026-04-22.md- Tabela: file path → line → reference → klasa (a/b/c) → preporuka (zadržati / migrate na pinned snapshot / migrate na floating alias)
- PM review report → ja izdajem
decisions/2026-04-22-model-route-naming-locked.mdLOCK convention.
Budget cap: $0.10 (read-only audit, samo grep + classify)
Wall-clock: 1-2h
Exit ping: D:\Projects\PM-Waggle-OS\sessions\2026-04-22-sprint-11-b3-opus46-audit-exit.md sa: report file path, count by class, top 3 najprioritetnijih cleanup-a.
Day 2 AM execution rules
Paralelizam: A2 + B2 + B3 mogu trčati istovremeno (no inter-dependence). Predlog redosleda po complexity load: B3 (najlakši, čisti audit) → B2 (mid, treba unit testovi) → A2 (najteži, harness extension).
Cumulative budget Day 2: $0.30 ($0 + $0.20 + $0.10). Hard alarm at 130% = $0.39. Ako tokom rada vidiš da grok-4.20 unit testovi pretiti da preskoče $0.20 cap → STOP, ping PM, ne nastavi.
Logging: sve LIVE pozive (B2 unit testovi, eventualni A2 smoke verifikacija) loguj sa cost_usd i latency_ms u test output.
Exit kriterijumi za Day 2 AM blok:
- A2 CLOSED → §4 design doc rows 4–7 green + exit ping fajl postoji
- B2 CLOSED → 4/4 unit testovi green + LOCK doc reference verifikovan u commit message + exit ping fajl
- B3 CLOSED → report fajl postoji + classification complete + exit ping fajl
Kada sva tri exit ping-a budu na disku, PM (Cowork) izdaje Day 2 AM close memo i autorizuje C2 (Stage 1 mikro-eval) za Day 2 PM ili Day 3 AM.
Reference (sve pročitati pre koda)
| Dokument | Path |
|---|---|
| Sprint 11 master brief | D:\Projects\PM-Waggle-OS\briefs\2026-04-22-cc-sprint-11-kickoff.md |
| A1 ratifikacija (A2 scope LOCK) | D:\Projects\PM-Waggle-OS\decisions\2026-04-22-h-audit-1-design-ratified.md |
| H-AUDIT-1 design doc | D:\Projects\waggle-os\docs\plans\H-AUDIT-1-DESIGN-DOC-2026-04-22.md (commit 008deac) |
| Tie-break policy LOCK (B2 vendor swap) | D:\Projects\PM-Waggle-OS\decisions\2026-04-22-tie-break-policy-locked.md |
| Stage 2 config LOCK (kontekst) | D:\Projects\PM-Waggle-OS\decisions\2026-04-22-stage-2-primary-config-locked.md |
| Sprint 11 scope LOCK | D:\Projects\PM-Waggle-OS\decisions\2026-04-22-sprint-11-scope-locked.md |
| Day 1 status | D:\Projects\PM-Waggle-OS\sessions\2026-04-22-sprint-11-day-1-status.md |
| LiteLLM config (vendor routes) | D:\Projects\waggle-os\litellm-config.yaml |
Idi.