CC-1 Brief — C2 Stage 1 Mikro-eval Kickoff Authorization
Datum: 2026-04-22
Sprint: 11 · Track C · Task C2
Authority: PM (Marko Marković), 2026-04-22 PM Cowork ratification
Pre-req gates: A2 ✅ CLOSED · B1 ✅ CLOSED · B2 ✅ CLOSED · LiteLLM container UP (verified at kickoff time)
Budget: $5–15 hard cap (per Day 2 PM plan §2 of 2026-04-23-sprint-11-day-2-am-status.md)
Hard alarm @ 130%: $20
1. Authorization
C2 Stage 1 mikro-eval is AUTHORIZED to kick off as soon as §2 pre-req is satisfied. CC-1 may execute on Day 2 PM or Day 3 AM at its discretion; PM does not need to be in-loop for kickoff itself, only for exit ping review.
Two decisions are folded in alongside the C2 kick:
- B3 cleanup ticket (HIGH + MEDIUM) is authorized to land before C2 kickoff per
decisions/2026-04-22-model-route-naming-locked.md§3. Surgical fix inanthropic-proxy.ts:43-44andworkspace-templates.ts:406. Test + lint guard required per §4. Estimated 1h, no LLM cost. CC-1 may sequence as: B3 cleanup commit → docker health-check → C2 kickoff in a single working block. - B2 fold-in: C2 is the first invocation that wires
resolveTieBreakinto the Stage 2 judge runner on 3-primary splits per B2 exit ping §6. ExistingjudgeEnsembleretains its internal contract; the wire-up replaces thecomputeMajoritycall on 3-vote primary ensemble paths only.
2. Pre-req: Docker / LiteLLM health-check
Mandatory step zero. Docker Desktop went down between B1 smoke (2026-04-21T17:54Z) and B2 smoke attempt (2026-04-21T23:01Z); Marko restarted within ~3 minutes. The same risk applies to C2.
docker ps --filter "name=waggle-os-litellm-1" --format "{{.Names}} {{.Status}}"
Expected output: waggle-os-litellm-1 Up <duration>
If container not Up:
- Restart Docker Desktop (Marko handles UI; CC-1 cannot trigger Docker Desktop UI from sandbox).
- Wait for Docker daemon ready:
until docker info >/dev/null 2>&1; do sleep 2; done(cap at 60s). - Bring up LiteLLM stack:
docker compose -f docker-compose.litellm.yml up -d(path per repo convention). - Wait for container Up:
until docker ps --filter "name=waggle-os-litellm-1" --filter "status=running" -q | grep -q .; do sleep 2; done(cap at 60s). - Smoke the proxy:
curl -sS http://localhost:4000/health | jq— expect{"healthy_count": <n>, "unhealthy_count": 0}or equivalent green signal from LiteLLM admin. - Re-run the
docker pscheck from step zero. Only proceed when container is Up.
If container is Up but LiteLLM /health returns unhealthy or 5xx: abort C2 kickoff, write a short sessions/2026-04-22-c2-blocked-litellm-unhealthy.md ping with the captured output, and notify PM. Do NOT attempt to debug LiteLLM mid-kickoff — that is a separate track.
3. Invocation
Per B1 exit ping §3.1 + A2 exit ping §6 (template unchanged):
node benchmarks/harness/src/runner.ts \
--model qwen3.6-35b-a3b-stage2 \
--cell raw \
--dataset locomo \
--limit 10 \
--seed 42 \
--live \
--budget 10
Output JSONL goes to benchmarks/runs/2026-04-22-c2-stage1-mikroeval/raw.jsonl (or whatever path the runner picks per current convention; do not override).
4. Exit criteria
C2 is CLOSED when ALL of:
- 10 instances evaluated end-to-end. No partial runs counted as PASS.
- A2 wire confirmed live. Every JSONL row carries
reasoning_content+reasoning_content_chars+reasoning_shape ∈ {'message.reasoning_content', 'message.reasoning', 'body.reasoning_content'}. Zeroreasoning_shape: 'unknown'events on this thinking=on route — if any appear, that is a drift signal worth investigating before closing. - B2 wire confirmed live (if any 1-1-1 split occurs). When a 3-primary split lands as 1-1-1,
resolveTieBreakshould fire withpath=quadri-vendorandfourth_vendor_slug='xai/grok-4.20', observable in pino events. If no 1-1-1 occurs in the 10-instance sample (likely — split rate is sparse), CC-1 reports "no tie-break trigger observed in sample, B2 path unverified live in C2 — C3 will exercise it at scale" and that is an acceptable interim state. - Budget ≤ $15. Exit ping reports actual spend with breakdown by call class (primary judge, tie-break, target model).
- Zero NETWORK_ERROR / 5xx tail on the run. Transient single-call retries within the runner's own retry budget are OK; persistent infra issues are NOT.
- Aggregate report generated.
buildAggregateover the JSONL produces a summary block with thereasoningContent { count, sumChars, p50Chars, p95Chars, shapeDistribution }slot populated per A2 §2.1. - Exit ping written to
PM-Waggle-OS/sessions/2026-04-22-sprint-11-c2-stage1-mikroeval-exit.mdfollowing the same template as B1/A2/B2/B3 (deliverables, validation gates, observability sample, budget, related files). Cite this brief and the four pre-req exit pings as authority.
5. Failure / abort criteria
C2 should be ABORTED (not failed-and-recorded — actually aborted mid-run) if ANY of:
- Budget burn > $20 (130% of cap) at any partial-run checkpoint.
- LiteLLM
/healthflips unhealthy mid-run. - Persistent NETWORK_ERROR for >3 consecutive calls on the same target model.
reasoning_content_shape_unknowndrift event fires more than once in the sample (signals provider schema drift; C2 should pause until investigated).
On abort: write a short sessions/2026-04-22-c2-aborted-<reason>.md ping with captured state, do NOT clean up partial JSONL (it is forensic evidence), notify PM.
6. What C2 does NOT need to do
- Does NOT need to wait on A3 bench-spec LOCK. A3 governs Stage 2 mass-run scope (C3 + H-42a/b); C2 is a 10-instance smoke on the existing B1-LOCKED config and is independent.
- Does NOT need to wait on B4 Stage 2 kickoff memo. B4 is PM-led; C2 is a pure CC-1 execution.
- Does NOT need PM authorization for the B3 cleanup commit if CC-1 chooses to land it before C2. Authorization is granted in §1 of this brief.
7. After C2 PASS
- C3 (Stage 2 4-cell mini PASS) is unblocked but gated on A3 bench-spec LOCK. CC-1 should NOT auto-kick C3 on C2 PASS — wait for PM authorization that follows A3 LOCK.
- B4 Stage 2 kickoff memo can incorporate the C2 readiness signal once C2 is CLOSED. PM picks up B4 in parallel; CC-1 contributes a 1-paragraph "harness readiness assessment from C2" addendum on PM request.
8. Sprint 11 close path after C2
If C2 PASSes and B3 cleanup ticket lands, Sprint 11 reaches 8/10 CLOSED (A1, A2, B1, B2, B3, C1, C2 + B3 cleanup as a sub-deliverable of B3 audit). Remaining: A3 (PM-Marko 30min), B4 (PM-led memo), C3 (gated on A3). Sprint 11 can plausibly reach 9/10 CLOSED if A3 is ratified within 48h and C3 kickoff follows.
9. Related
PM-Waggle-OS/sessions/2026-04-23-sprint-11-day-2-am-status.md— master status (Day 2 PM plan §2 lists C2 as next CC-1 work)PM-Waggle-OS/sessions/2026-04-22-sprint-11-h-audit-1-exit.md— A2 exit ping (reasoning_content wire reference)PM-Waggle-OS/sessions/2026-04-22-sprint-11-b1-stage2-config-exit.md— B1 config + invocation templatePM-Waggle-OS/sessions/2026-04-22-sprint-11-b2-tiebreak-exit.md— B2 fold-in note §6PM-Waggle-OS/decisions/2026-04-22-model-route-naming-locked.md— B3 cleanup authorizationPM-Waggle-OS/decisions/2026-04-22-tie-break-policy-locked.md— B2 LOCK authorityPM-Waggle-OS/decisions/2026-04-22-stage-2-primary-config-locked.md— B1 LOCK authority
C2 AUTHORIZED. Pre-req gate is the single Docker health-check in §2. CC-1 owns the kick; PM reads the exit ping. B3 cleanup commit is in-scope to land alongside or just before. C3 gated on A3 — do not auto-kick.