Files
waggle-os/benchmarks/results/stage3-gate-p-plus-probe-summary.md
Oleg Maslov 0c3e2ead3b
Some checks failed
Installer Smoke / installer-smoke (push) Has been cancelled
moving
2026-09-02 10:10:29 +02:00

774 B
Raw Permalink Blame History

Stage 3 Gate P+ Pre-Flight Probe — Summary

Date: 2026-04-24 · Branch: feature/c3-v3-wrapper · Probe log: benchmarks/results/stage3-gate-p-plus-probe-log.jsonl (50 rows).

Verdict: FAIL — 24 / 50 HTTP 429. Latency ms: min=2476, p50=4268, p95=5276, max=5512. Wall-clock 35.19 s.

Root cause (429 body, call 25): "Quota exceeded for metric: generate_requests_per_model, limit: 25, model: gemini-3.1-pro." Per-model 25 RPM cap on the preview model; NOT scaled by account Tier 2. First 25 calls (t=014.7 s) = 200 OK; remainder 429 as bucket exhausted.

Kickoff mechanism: claude_code_bash_tool_synchronous, probe pid=46912, parent Claude Bash pid=3828. Process-tree attached; no run_in_background.

Do NOT re-kick. Escalating.