# LOCKED Decision — hive-mind Extraction Effort **Date**: 2026-04-18 **Status**: LOCKED **Backlog ref**: H-34 **Decided by**: Marko Marković ## Decision Realistic effort estimate for hive-mind extraction from the waggle-os monorepo into its own OSS repository is **5 to 10 working days**. H-34 is classified as a P0 ship-blocker in the HIGH tier of BACKLOG-MASTER-2026-04-18. ## State at decision time - Extraction plan: ~40% complete - Code migration: not started - Target repository: `D:\Projects\hive-mind\` (empty, awaiting migration) - License target: Apache 2.0 with ee/ source-available pattern (Mastra playbook) ## Rationale Earlier estimates of "1 to 2 days" were optimistic. The realistic scope includes: - Extracting core memory primitives (bitemporal KG, MPEG-4 frame architecture, SCD-Type-2 validity) - Packaging the MCP server interface for third-party consumption - Moving all 11 harvest adapters (chatgpt, claude, claude-code, claude-desktop, gemini, perplexity, markdown, plaintext, pdf, url, universal) - Setting up DCO, CLA, contribution guidelines, and CI that a credible OSS project requires - Documentation pass (README, architecture overview, API reference) sufficient for external contributors - Ensuring compliance-by-default story (EU AI Act audit triggers) is intact after extraction Cutting below 5 days requires cutting scope, not raising tempo. Any estimate under that threshold needs an explicit scope-reduction justification. ## Downstream dependencies Once H-34 closes, the following can begin: - GitHub repository public visibility toggle - Apache 2.0 license file commit - First public announcement sequencing (still gated by [M]-07 SOTA proof) - 12-week OSS launch sprint per research/01-oss-memory-packaging-strategy.md ## Reversibility Effort estimate is revisable downward only with explicit scope reduction. Upward revision expected if extraction reveals hidden coupling with Waggle-specific packages.