# Marko's Second Brain — Wiki Index *Compiled from 29 memory files + 422 session messages + git history.* *Source: Claude Code sessions, March 27 — April 13, 2026.* *Last compiled: 2026-04-13* --- ## Organizations - [[Egzakta Group]] — EUR 31M tech group, 200+ people, 3 founders, Netherlands holding ## Products - [[Waggle OS]] — Desktop AI agent platform with persistent memory - [[KVARK]] — Sovereign enterprise AI platform (EUR 1.2M contracted) ## People - [[Marko Markovic]] — Co-founder, Egzakta. Builder of everything here. ## Concepts - [[Mind Architecture]] — 6-layer video-codec memory in SQLite (.mind files) - [[Tier Strategy]] — Trial 15d → Free → Pro $19 → Teams $49 → KVARK - [[EU AI Act Strategy]] — Compliance by default, Aug 2 2026 deadline - [[Memory Harvest]] — Import AI conversations from any platform - [[Wiki Compiler]] — Karpathy LLM Wiki + Waggle memory = second brain (THIS) ## Development Timeline | Date | What Happened | Sessions | |------|--------------|----------| | Mar 6 | Name chosen: "Waggle" (from waggle dance). Vision, business model. | Brainstorm | | Mar 11 | Phase 3 gap analysis — 48 critical gaps identified | Analysis | | Mar 17 | B2B lead gen stress test — agent speed/persistence gaps found | Testing | | Mar 23 | UAT score 84/100, "Honey on Dark Steel" design system | M2 | | Mar 27-31 | M2 sprint — 13 sessions, 10 commits. P0 fixes, network resilience, TS cleanup, keyboard flow, telemetry | M2 Sprint | | Apr 1-5 | Deep refactoring marathon — multiple audit rounds, UI/UX overhaul | Refactor | | Apr 6-7 | Agent intelligence sprint — 9 features, 112 tests, persona expansion | Phase 1 | | Apr 8 | Structural refactors — chat.ts split, personas.ts split, tools extract | Session 2 | | Apr 9-10 | ULTRAPLAN Phases 1-9 complete. 148 MCP servers. Real harvest (156 frames). | Mega session | | Apr 11 | Phases A+B: The Room, per-session orchestrators, tiered autonomy. 50 tests. | Killer day | | Apr 12 (AM) | Phase A/B binary verification. 11 bugs fixed. | Verification | | Apr 12 (PM) | E2E suite 13/13 green. System map. Loading shimmer. | Polish | | Apr 12 (EVE) | Phases C+D. 96 E2E. Tier restructure. Binary built. | Mega session | | Apr 12 (NIGHT) | 3 P0s fixed. WeaverPanel. 101 dirty files committed. | Cleanup | | Apr 12 (S2) | Trial expiry modal. MultiMindCache. Cross-workspace search. | Features | | Apr 13 | **29 commits.** Team memory, S3/MinIO, KG, budget cap, Ollama, Memory MCP. Entire backlog cleared. | MEGA | | Apr 13 (now) | Memory MCP 5 fixes. Wiki Compiler spec (1,639 lines). | This session | ## Open Items - **Stripe:** Create PRO ($19) + TEAMS ($49) products in dashboard - **Code signing:** Purchase certificate for Windows installer - **Wiki Compiler:** 1,639-line spec ready, not yet implemented