# Total Remaining Work — Everything to Launch **Counted from:** REMAINING-BACKLOG-2026-04-16.md + HIVE-MIND-INTEGRATION-DESIGN.md **Date:** 2026-04-16 --- ## Raw Item Count | Category | Items | Engineering Days | Notes | |----------|-------|-----------------|-------| | **Block 1: Marko's actions** | 10 | 0 | Your time, not mine | | **Block 2: Harvest real data** | 9 | 3 | Cursor adapter + imports | | **Block 3: Wiki v2** | 4 | 5 | Obsidian, Notion adapters, health UI | | **Block 3b: Compliance report** | 5 | 3.5 | PDF route, templates, full-page viewer | | **Block 3c: UX fixes** | 26 | 5 | 5 QW + 6 medium + 7 engagement + 9 a11y | | **Block 3c-R: Responsive** | 5 | 2 | Dock, status bar, chat, onboarding, windows | | **Block 3d: CLAUDE.md open work** | 2 | 0.5 | PersonaSwitcher redesign | | **Block 3e: Cross-reference** | 9 | 7 | MS Graph, light mode, KG viewer, binary build | | **Block 4: Harvest UX polish** | 4 | 5 | SSE progress, resume, identity, onboarding | | **Block 5: Memory proof** | 7 | 10 | Test execution (~$300-500) | | **Block 6: GEPA proof** | 6 | 18 | Test execution (~$1,500-2,500) | | **Block 7: Combined proof** | 3 | 6 | Test execution (~$500) | | **Block 8: Write papers** | 4 | 5 | Writing, not code | | **Block 9: Launch prep** | 8 | 5 | Stripe, signing, Clerk, hive-mind extract, binary | | **Block 10: Launch day** | 5 | 1 | Ship day | | **hive-mind integration** | 8 | 7 | MCP resources, CLI, hooks, installer | | **Strategic decisions** | 6 | 0 | Marko decisions | | **Content (non-code)** | 3 | 2 | Demo video script, LinkedIn posts | | **TOTAL** | **124 items** | **~85 days sequential** | | --- ## But Most Runs in Parallel ``` WEEK 1-2: Code + Polish (parallel tracks) ├── Block 3c QW: 5 quick wins (0.25 days) ├── Block 3c medium: 6 UX fixes (1.5 days) ├── Block 3d: PersonaSwitcher redesign (0.5 day) ├── Block 3b: Compliance PDF + templates (3.5 days) ├── Block 3e-CR2: Light mode audit (0.5 day) ├── Block 3e-CR3: KG viewer gaps (0.5 day) ├── Block 3e-CR7: CLAUDE.md update (0.1 day) ├── hive-mind: MCP resources + instructions (1.5 days) └── Block 2-1.6: BUILD Cursor adapter (1 day) SUBTOTAL: ~2 weeks WEEK 2-3: Harvest + Harvest UX (needs Marko's exports) ├── Block 2: Import all platforms (2 days) ├── Block 4: Harvest UX (SSE, resume, onboarding) (5 days, parallel) ├── Block 3: Wiki v2 (Obsidian, Notion, health UI) (5 days, parallel) └── Block 3e-CR1: MS Graph connector (3 days, parallel) SUBTOTAL: ~1.5 weeks WEEK 3-4: Engagement + hive-mind + Proofs start ├── Block 3c ENG: 7 engagement features (3 days) ├── Block 3c A11Y: 9 accessibility fixes (1 day) ├── Block 3c-R: 5 responsive fixes (1 day) ├── hive-mind: CLI + hooks + installer (5 days) ├── Block 5 START: Memory proof steps 1-3 (5 days, ~$250) └── Block 6 START: Task suite curation (3 days, $0) SUBTOTAL: ~1.5 weeks WEEK 4-6: Proofs (mostly test execution, burns budget) ├── Block 5: Memory proof steps 4-7 (5 days, ~$150) ├── Block 6: GEPA baselines + evolution + judges (12 days, ~$2,000) ├── Block 9: Launch prep parallel track (5 days) │ ├── Stripe smoke test (needs M7) │ ├── Clerk integration │ ├── hive-mind source extraction │ ├── Binary build + smoke test │ └── Landing page final polish └── Content: Demo video script + LinkedIn drafts (2 days) SUBTOTAL: ~2-3 weeks WEEK 6-7: Combined proof + Papers ├── Block 7: Combined effect test (6 days, ~$500) ├── Block 8: Write Paper 1 + Paper 2 (5 days, parallel) └── Block 8.3: External peer review (Marko action) SUBTOTAL: ~1 week WEEK 7-8: Final prep + Launch ├── Block 9: Final binary + signing + notarization (2 days) ├── Block 10: Launch day (1 day) └── Post-launch: monitor, fix, respond (ongoing) SUBTOTAL: ~1 week ``` --- ## Summary | Metric | Value | |--------|-------| | **Total items** | 124 | | **Engineering days (sequential)** | ~85 | | **Calendar weeks (parallel)** | **~7-8 weeks** | | **Budget (API + cert)** | **$2,650-4,000** | | **Blocked on Marko** | 10 external actions | | **Strategic decisions needed** | 6 | --- ## By Priority (what matters most) ### P0 — Launch Blockers (must do) | Item | Days | Budget | |------|------|--------| | Harvest real data (Block 2) | 3 | $50 | | Memory proof (Block 5) | 10 | $300-500 | | GEPA proof (Block 6) | 18 | $1,500-2,500 | | Combined proof (Block 7) | 6 | $500 | | Write papers (Block 8) | 5 | $0 | | Launch prep — Stripe, signing, Clerk, binary (Block 9) | 5 | $300-500 cert | | hive-mind source extraction (CR-6) | 3 | $0 | | **P0 subtotal** | **50 days** | **$2,650-4,000** | ### P1 — Ship Quality (should do before launch) | Item | Days | |------|------| | 5 UX quick wins (QW 1-5) | 0.25 | | PersonaSwitcher redesign (OW-6) | 0.5 | | Compliance PDF route + template (3b.1-3b.2) | 1.5 | | Light mode audit (CR-2) | 0.5 | | CLAUDE.md update (CR-7) | 0.1 | | Cursor adapter (1.6) | 1 | | hive-mind MCP resources + instructions (Layer 1+2) | 1.5 | | Demo video script (CR-4) | 1 | | **P1 subtotal** | **~6.5 days** | ### P2 — Polish (can ship without, do soon after) | Item | Days | |------|------| | 6 medium UX fixes | 1.5 | | 7 engagement features | 3 | | Harvest UX full (SSE, resume, onboarding tile) | 5 | | Wiki v2 (Obsidian, Notion, health UI) | 5 | | Compliance full-page viewer + branding (3b.3-3b.5) | 2 | | KG viewer gaps (CR-3) | 0.5 | | hive-mind CLI + hooks + installer (Layer 3) | 5 | | **P2 subtotal** | **~22 days** | ### P3 — Future (post-launch) | Item | Days | |------|------| | 9 accessibility fixes | 1 | | 5 responsive fixes | 2 | | MS Graph connector (CR-1) | 3 | | KVARK compliance template (3b.5) | 0.5 | | LinkedIn posts (CR-5) | content | | Mac notarization (CR-9) | Marko | | **P3 subtotal** | **~6.5 days** | --- ## The Honest Answer **To launch (P0): ~50 engineering days, ~$3,000, ~5-6 weeks calendar.** Most of that is test execution (proofs), not coding. Pure new code is ~15 days. **To launch with quality (P0+P1): add ~6.5 days → ~56 days, same budget.** **To launch with polish (P0+P1+P2): add ~22 days → ~78 days, same budget.** **Everything including future (P0+P1+P2+P3): ~85 days total.** The critical path is the GEPA proof (18 days) — that's the longest single item and it's on the critical path to Paper 2.