# Phase 5 §5 Cross-Stream Dependencies **Date:** 2026-04-30 **Status:** Declared per `feedback_waggle_primary_framing` (NEW 2026-04-30) **Manifest:** `gepa-phase-5/manifest.yaml` § cross_stream_primary + § cross_stream_secondary **Brief:** `D:/Projects/PM-Waggle-OS/briefs/2026-04-29-phase-5-deployment-brief-v1.md` §6 This doc enumerates the cross-stream destinations for Phase 5 production-stable evidence in **primary** vs **secondary** order per the binding feedback rule. Phase 5 production-stable is a **Waggle-launch-readiness gate** with KVARK as a downstream beneficiary. --- ## Strategic framing (binding rule) `feedback_waggle_primary_framing`: > Waggle is the demand-creation engine for KVARK (per CLAUDE.md §1 strategic function). KVARK without Waggle has no funnel; the strategic order is Waggle-first because Waggle drives the inbound that qualifies into KVARK. Reversing primary/secondary in deployment narratives confuses positioning and risks framing the sovereign-enterprise tier as the entry point rather than the upgrade path. **Bound:** any brief that inverts primary/secondary order (KVARK first, Waggle second) flagged for amendment. Phase 5 brief §6 lists the destinations but does not explicitly tag primary/secondary; this doc closes that authoring gap by declaring the order. --- ## Primary cross-stream destinations (Waggle-launch-readiness) ### P1 — Waggle landing v3 Proof Card 1 swap | Field | Value | |---|---| | Brief anchor | §6.1 | | Trigger condition | `phase_5_production_stable + Pass II numbers + retrieval engagement validated samples` | | Action | Update Landing v2.3 Proof Card 1 sa **PROVENANCE → BENCHMARK** swap (concrete numbers from Phase 5) | | Owner | PM authoring + claude.ai/design generation | | Timing post-production-stable | 2-3 weeks | | Additional audit anchor | `project_landing_v2_basics_2026_04_28` | ### P2 — Waggle launch comms | Field | Value | |---|---| | Brief anchor | §6.1 implicit extension (brief lists §6.1-§6.4 but doesn't separately enumerate launch comms — declared here per `feedback_waggle_primary_framing`) | | Trigger condition | `phase_5_production_stable` | | Action | Public launch comms — Waggle production-stable evidence as anchor; KVARK pitch is downstream consumption of the same evidence | | Owner | Marko + PM | | Timing post-production-stable | Aligned with landing v3 swap | ### P3 — arxiv §5.1-§5.2 (methodology + Faza 1 results) | Field | Value | |---|---| | Brief anchor | §6.2 (§5.1 + §5.2 portion only — §5.3 KVARK enterprise narrative is **secondary**, see S2 below) | | Trigger condition | `phase_5_production_stable + Marko_arxiv_co_author_roster_ratification + endorsement_contact` | | Action | arxiv §5.1 (methodology + manifest v7 + 11 amendments transparent narrative) + §5.2 (Faza 1 results: cross-family generalization, claude + qwen-thinking pass; gpt selection bias scoping) — Waggle-primary academic credibility | | Owner | Marko authoring | | Timing post-production-stable | TBD | --- ## Secondary cross-stream destinations (KVARK-downstream) ### S1 — KVARK enterprise pitch deck | Field | Value | |---|---| | Brief anchor | §6.3 | | Trigger condition | `phase_5_production_stable + Marko_pitch_deck_draft_approval` | | Action | KVARK enterprise pitch deck section: "On-prem Qwen + Waggle harness validated Opus-class on real production traffic, X% retrieval parity, Y% Pass II floor" | | Owner | Marko | | Timing post-production-stable | TBD post landing v3 swap | | Relationship to primary | Downstream beneficiary of landing v3 evidence (consumes same Pass II + retrieval numbers) | ### S2 — arxiv §5.3 KVARK enterprise narrative | Field | Value | |---|---| | Brief anchor | §6.2 §5.3-only portion | | Trigger condition | `phase_5_production_stable` | | Action | arxiv §5.3 KVARK enterprise narrative — Qwen 35B = Opus-class on production traffic = KVARK pitch scientific anchor | | Relationship to primary | Downstream beneficiary of §5.1 + §5.2 (consumes same methodology + results sections) | ### S3 — Faza 2 sprint planning | Field | Value | |---|---| | Brief anchor | §6.4 | | Trigger condition | `phase_5_production_stable + 2 weeks observation` | | Scope | gpt::gen1-v2 N=16 re-validation; qwen-non-thinking deeper investigation (retrieval-quality decoupling characterization); generic-simple investigation (necessary-but-not-sufficient retrieval scoping); arxiv §5.4 finalization | | Budget headroom | $71.51 USD (decoupled from Phase 5 cap; Faza 1 unspent of $115 cap) | | Timing post-production-stable | 2 weeks observation, then Faza 2 sprint kick-off | | Relationship to primary | Methodology continuation; not Waggle-launch trigger directly | --- ## Sequencing implications If multiple primary destinations are time-pressured: 1. **Always P1 first** (landing v3 swap is the customer-facing surface). 2. **P2 in parallel** (launch comms can author against the same evidence as P1). 3. **P3 follows** (arxiv has longest authoring timeline; doesn't gate launch). Secondary destinations cannot pre-empt primary: - **S1 KVARK pitch deck draft** can begin authoring during P1-P2-P3 work, but cannot precede them publicly. - **S2 arxiv §5.3** authored alongside P3 §5.1-§5.2 (same artifact), but the §5.3 KVARK section never carries primary-narrative weight. - **S3 Faza 2 planning** is post-launch methodology continuation; sequenced after the 2-week observation window. --- ## Anti-pattern guards Per `feedback_waggle_primary_framing` "How to apply": - ❌ "Phase 5 production-stable is a KVARK-readiness gate" — wrong. It is a Waggle-launch-readiness gate. - ❌ KVARK pitch deck listed before Waggle landing v3 in cross-stream dependency tables — flag for amendment. - ❌ arxiv §5.3 weight pitched as primary academic narrative — §5.3 is a downstream lift; §5.1 + §5.2 are primary. - ✅ Primary order: Waggle landing v3 → Waggle launch comms → arxiv §5.1-§5.2. - ✅ Secondary order: KVARK pitch deck → arxiv §5.3 → Faza 2 sprint planning. --- **End of cross-stream declaration. Manifest § cross_stream_primary + § cross_stream_secondary mirror this doc; if drift detected, manifest is canonical.**