# LOCKED Decision — Phase 5 Cost Cap Amendment (per brief §4.4) **Date:** 2026-04-30 **Status:** LOCKED **Author:** PM **Ratified by:** Marko ("stavi visi slobodno", 2026-04-30) **Implements:** Brief §4.4 amendment procedure (no-revisit-without-amendment binding) **Trigger:** §0.3 probe-validated cost ceiling $38.34 exceeded original $25 hard cap --- ## §1 — Decision Phase 5 cost cap amendment ratified: | Field | Original | Amended | |---|---|---| | Hard cap | $25 | **$75** | | Halt trigger | $20 | **$60** | | Expected total | $8-13 | **$35-45** | | Buffer above probe-validated $38.34 | (negative) | ~96% (= $75/$38.34) | Original cost cap was conservative PM projection authored before probe data existed. Probe revealed claude::gen1-v1 stretch case (1500 output tokens × Opus 4.7 $25/M output) dominates economics. Amendment preserves both variants (claude::gen1-v1 + qwen-thinking::gen1-v1) per §1 LOCKED scope intact. Faza 2 budget headroom unchanged: $71.51 (decoupled from Phase 5 cap). --- ## §2 — Why amend, not pivot to Opcija A or C PM originally proposed Opcija C (qwen-only canary) as cleanest math. Marko corrected: cost discipline argument applied to research evals, not production deployment. Egzakta Group EBITDA 4.5M makes $35-45 production deployment cost trivial; preserving scope (both variants) over saving $30 is correct trade-off. Opcija A (volume reduction 740→386) preserved scope but had zero buffer — single probe overshoot or production traffic spike halt-uje sve. Risky for 14-day canary. Amendment (this decision) preserves scope + provides 96% buffer over probe-validated reality. Cleanest path forward. --- ## §3 — Distinction: production vs research cost discipline **Important precedent encoded:** cost cap discipline for **production deployment** ≠ cost cap discipline for **research evals**. - **Research evals** (e.g., Faza 1 manifest v7, future GEPA generations) — strict pre-registered caps with no-revisit-without-amendment binding. Cost cap is proxy for methodology constraint (pre-registration discipline). Amendments require explicit halt-and-PM with §F-style verdict gate. - **Production deployment** (Phase 5, future deployments) — operational cost, not methodology constraint. Cap is conservative PM projection that can be amended when probe data reveals underestimate. Amendment requires decision memo + PM ratification but does not invalidate prior evidence. Two separate discipline regimes. Memory entry binds future PM briefs. --- ## §4 — Phase 5 brief §5.4 update PM (ja) updates brief in-place with revised cap fields. Audit anchor preserved: original cap values commented inline as "v1: $25/$20 (superseded 2026-04-30 per cost amendment LOCKED memo)". --- ## §5 — CC continuation authorization Per amendment, §0 §0.3 verdict revises from HARD-CAP-EXCEED to **PASS** ($38.34 < $60 halt < $75 hard cap). Aggregate §0 verdict revises to PASS sva 4 sub-gates: - §0.1 PASS (substrate readiness, post quarantine commit 50393b1) - §0.2 PASS (config inheritance audit) - §0.3 PASS (probe-validated, $38.34 within amended $75 cap) - §0.4 PASS-design-stage (per prior PM signoff) CC unblocked za §1-§5 implementation per Phase 5 brief. --- ## §6 — Audit trail anchors - Phase 5 brief: `briefs/2026-04-29-phase-5-deployment-brief-v1.md` (§5.4 updated in-place) - Phase 5 brief LOCKED memo: `decisions/2026-04-29-phase-5-brief-LOCKED.md` - Phase 5 scope LOCKED: `decisions/2026-04-29-phase-5-scope-LOCKED.md` - §0 preflight evidence: `D:/Projects/waggle-os/gepa-phase-5/preflight-evidence.md` (CC-side, commit 11c7532 on phase-5-deployment-v2) - Faza 1 closure: `decisions/2026-04-29-gepa-faza1-results.md` - Memory entry: `feedback_production_vs_research_cost_discipline.md` (mirror: `D:/Projects/PM-Waggle-OS/memory-mirror/feedback_production_vs_research_cost_discipline.md`) - Memory entry: `feedback_waggle_primary_framing.md` (mirror: `D:/Projects/PM-Waggle-OS/memory-mirror/feedback_waggle_primary_framing.md`) --- **End of LOCKED decision. Phase 5 §0 PASS aggregate. CC authorization za §1-§5 LIVE.**