moving
Some checks failed
Installer Smoke / installer-smoke (push) Has been cancelled

This commit is contained in:
Oleg Maslov
2026-09-02 10:10:29 +02:00
commit 0c3e2ead3b
3841 changed files with 970576 additions and 0 deletions

View File

@@ -0,0 +1,218 @@
# Overnight PM Execution Log — 2026-04-24/25
**Date**: 2026-04-24 evening through 2026-04-25 morning
**Authority**: Marko Marković delegated full execution at ~01:00 CET ("i sve sam guraj sad, sam odlucuj, ja odoh da spavam citam ujutro sta si sve uradio")
**PM**: claude-opus-4-7 (Cowork)
**Status**: 3 deliverables completed + benchmark monitoring + persistence
---
## §1 What was completed
### 1.1 Apps/www Next.js port brief
**Path**: `briefs/2026-04-25-cc1-apps-www-nextjs-port-brief.md`
**Length**: ~6,500 words sa migration plan, DS retrofit, bootstrap items
**Status**: Ready-to-paste u CC-1 kada SOTA padne
Key decisions taken without further input:
- **Stack target**: Next.js 15+ App Router (latest stable)
- **NO Tailwind** — preserve existing custom CSS pattern (already maps to DS tokens)
- **API endpoints internalized** (replace external `cloud.waggle-os.ai` sa Vercel API routes)
- **i18n via next-intl** (engleski first per `feedback_i18n_landing_policy`)
- **Hosting recommend**: Vercel (alternative: Cloudflare Pages noted)
- **Provider stack picks**: Resend (waitlist), PostHog (analytics)
- **Theme toggle pattern**: localStorage `waggle.theme` + `data-theme` attribute swap
- **12 sequential commits** layout (preservation of Vite scaffolding through Commit 11, cleanup Commit 12 only after staging verified)
- **Wireframe v1.1 gap analysis** identified 5 missing sections to add (WhyNow + ThreeProducts + PersonasGrid 13-bee + FAQ + FounderNote)
### 1.2 Launch Comms Templates
**Path**: `briefs/2026-04-25-launch-comms-templates.md`
**Length**: ~4,500 words sa 6 ready-to-publish assets
**Status**: Templates sa explicit `[PLACEHOLDER]` markers za actual benchmark numbers (LOCOMO_SCORE, BASELINE_REF, H1_PVAL, RETRIEVAL_PASS, NO_CONTEXT_PASS, DELTA_PP, COST_USD, N400_DURATION)
Assets included:
- **Asset 1**: Technical blog post outline (2,500-3,500 words target)
- **Asset 2**: LinkedIn long-form (1,200-1,500 words)
- **Asset 3**: Twitter/X thread (10-12 tweets)
- **Asset 4**: hive-mind OSS GitHub README + release notes
- **Asset 5**: Waitlist email broadcast
- **Asset 6**: Press kit one-pager
Plus distribution sequence (T+0, +30min, +24h, +48h, +week), risk register, pre-publish checklist.
Key decisions taken:
- **Tone**: senior CxO + technical depth, no marketing fluff, openly acknowledge limitations
- **Hook**: "Mem0 je SOTA reference at [BASELINE_REF]%. We hit [LOCOMO_SCORE]%."
- **Distribution**: GitHub release + blog + LinkedIn + Twitter synchronized within 30 min, email broadcast +24h
- **Channel order**: technical depth (blog) → narrative (LinkedIn) → viral (Twitter thread) → community (Discord/Reddit/HN)
### 1.3 E2E Persona Test Matrix
**Path**: `briefs/e2e-persona-tests/2026-04-25-e2e-persona-test-matrix.md`
**Length**: ~5,000 words sa full test architecture
**Status**: Ready-to-execute matrix čeka prerequisite checklist od Marka (§6 of brief)
Architecture taken:
- **9 archetype matrix**: 3 monetization tier (Free/Pro/Teams) × 3 user proficiency (Starter/Pro/Professional power user)
- **13-bee persona overlay** mapping 1-2 personas per archetype za realism
- **20 coverage areas** (CA-1 onboarding through CA-20 custom skills)
- **10 cross-cutting scenarios** (CC-1 upgrade journey through CC-10 persona switch)
- **Friction log JSON schema** sa 0-5 friction_score scale, screenshot refs, structured event logging
- **Execution sequencing**: 5-day roll-out (Day 1 Starters, Day 2 Pros, Day 3 Professionals, Day 4-5 cross-cutting)
- **Total estimated**: ~25 scenarios × 30-60 min = 15-25h E2E testing wall-clock
Prerequisites flagged za Marka ujutru:
1. App accessible (dev server / staging URL / Tauri build)
2. 9 test accounts seeded sa appropriate persona + tier + data
3. Stripe test card credentials
4. Webhook stubs for provenance replay
5. Reset-between-tests procedure
---
## §2 Decisions taken without consultation
Per Marko-vog "sam odlucuj":
| Decision | Choice | Rationale |
|---|---|---|
| Next.js version | 15+ | Latest stable, App Router mature |
| CSS strategy | Preserve existing CSS vars | Already maps to DS tokens, no Tailwind churn |
| i18n library | next-intl | Native App Router compatibility |
| Hosting | Vercel | Zero-config, Stripe integration, edge runtime |
| Email service | Resend | Cheapest viable, dev-friendly API |
| Analytics | PostHog | In tools list (mcp__d53ae2ad...), session replay capable |
| Test card | 4242 4242 4242 4242 | Stripe standard test card |
| Onboarding step naming | Welcome → WhyWaggle → Persona → ApiKey → Template → ModelTier → Import → Tier → Ready | Per repo overlays/onboarding folder |
| E2E execution method | Claude in Chrome computer use | Per Marko explicit modality update |
| Friction score scale | 0-5 | Standard UX research convention |
| Persona overlay choice | bee-confused for Starter Free, bee-orchestrator for Power user Pro | Match persona character to archetype context |
---
## §3 Benchmark monitoring (overnight watch)
Runner status checks at intervals.
### 02:00 CET check (initial overnight)
Marko reported: full-context 251/400 in flight, no-context 400/400 ✓, oracle-context 400/400 ✓
### 06:00 CET check (PM observed)
- **no-context**: 400/400 ✓ (completed 23:49 UTC / 01:49 CET)
- **raw (oracle-context renamed in code)**: 400/400 ✓ (completed 01:59 UTC / 03:59 CET)
- **full-context**: 270/400 in progress (last write 04:00 UTC / 06:00 CET)
- **retrieval**: not started
- **agentic**: not started
Pace: ~32s/row consistent across cells. ETA u 06:00 CET projection:
- full-context completion: ~07:30-08:00 CET
- retrieval cell start: ~08:00, completion: ~12:00-13:00 CET
- agentic cell start: ~13:00, completion: ~17:00-18:00 CET (agentic typically slowest due to multi-step reasoning per instance)
**Total ETA: 2026-04-25 17:00-19:00 CET for all 5 cells complete.**
Budget tracking: not directly observable from filesystem; runner internal log presumably tracking cumulative spend. Will check via separate log inspection at next sync if needed.
### Note for Marko on benchmark
**No anomalies observed.** Runner remains healthy. Pace consistent. No log errors flagged in directory listings. Files growing monotonically. No timeout cascades visible. Continue confidence: HIGH.
If completion stretches past 19:00 CET, Marko should:
1. Check disk space (cumulative ~10MB total, trivial)
2. Tail log for any new error patterns
3. Verify openrouter MiniMax routing healthy (no 429 storms)
---
## §4 What I did NOT do (deferred for Marko ratification)
### Logo asset upload to claude.ai/design
DS sesija je completed sa svg fallback. Raster waggle-logo.jpeg + waggle-logo.png upload bi bio polish. Nije blocker. Deferred.
### CC-1 dispatch trigger for apps/www brief
Brief je ready-to-paste, ali ja ne pokrećem CC-1 sesiju autonomno bez Marko vidnog ratification. Marko paste-uje u CC-1 kada SOTA padne (and he's confident sa narrative direction).
### E2E test execution start
Trazi prerequisites checklist od Marka (§6). Ne mogu da krenem testing bez accessible app + test accounts.
### Manifest v6 §5.2.3 amendment for evaluator_loss reporting protocol
Phase 2 brief već je covered ovo, ne treba dodatno. Pomenuto here samo za completeness — no action.
### Decision document for "post-SOTA Marketing site light mode rendering"
DS Stage 4 light mode covered Waggle App. Marketing site light mode bi mogao biti zaseban turn ako Marko želi marketing site na oba moda. Trenutno deferred — apps/www port brief ima light mode infrastructure built in (data-theme attribute), Marketing site renderingu light variant bi trebao samo ThemeToggle tested + visual QA.
### Notification to ekipa o overnight rad
Ne pingujem Marka tokom njegovog spavanja per his explicit instruction.
---
## §5 Files modified / created
### New decisions/
- `decisions/2026-04-25-overnight-pm-execution-log.md` (this file)
### New briefs/
- `briefs/2026-04-25-cc1-apps-www-nextjs-port-brief.md`
- `briefs/2026-04-25-launch-comms-templates.md`
- `briefs/e2e-persona-tests/2026-04-25-e2e-persona-test-matrix.md`
### New scripts/
- `scripts/benchmark-progress.py` — Python helper for progress monitoring (Marko can run on demand: `python D:\Projects\PM-Waggle-OS\scripts\benchmark-progress.py`)
### Modified .auto-memory/
- (deferred to morning persist after final benchmark numbers are in)
---
## §6 Open items for Marko's morning review
1. **Apps/www brief** — review architecture choices in §1-7 of brief; if Vercel / Resend / PostHog don't fit budget posture, redirect; if Next.js 15 → 14 (more conservative) preferred, adjust
2. **Launch comms templates** — review tone calibration per `marko-markovic-style` skill conformance; pre-fill `[PLACEHOLDER]` after benchmark final numbers; add specific @-mentions for Twitter thread (researchers, orgs to tag)
3. **E2E test matrix prerequisites** — answer §6 of e2e brief: is app accessible (which URL/build)? test accounts seeded? Stripe test card available? webhook stubs live?
4. **Benchmark final ratification** — when N=400 completes ~17:00-19:00 CET, ratify PM-RATIFY-V6-N400-COMPLETE
5. **SOTA narrative decision** — IF result PASS: green-light all 6 launch comms assets for publish queue; IF result FAIL/PARTIAL: reframe per launch gate decision matrix (Task #28 still pending)
6. **CC-1 dispatch** — paste apps/www brief in CC-1 session post-SOTA
---
## §7 PM's recommended action sequence for Marko's day
1. **Wake check** (~07:00-09:00 CET): read this log + benchmark final progress check via Python script
2. **If benchmark still running**: monitor 1x/hour, no other actions until results
3. **If benchmark completed PASS**:
a. Ratify PM-RATIFY-V6-N400-COMPLETE
b. Fill `[PLACEHOLDER]` markers in launch comms templates
c. Paste apps/www brief in CC-1 session
d. Schedule launch publish window (recommend +24h delay for proper QA)
4. **If benchmark completed FAIL/PARTIAL**:
a. Open Task #28 (Launch gate reframe decision)
b. Discuss reframe options sa PM
c. Adjust launch comms tone (reframe template options pre-written u launch comms brief §risk register)
5. **E2E execution starts**: only after app accessible + test accounts ready (could be parallel with apps/www CC-1 work or after)
---
## §8 Confidence + risk
**Confidence in deliverables**:
- Apps/www brief: HIGH (deterministic, all decisions documented sa rationale)
- Launch comms: HIGH (templates honor brand voice, placeholders explicit, no overstated claims)
- E2E matrix: HIGH-MEDIUM (architecture solid, but execution depends on Marko-side prerequisites)
**Risks**:
- Apps/www CC-1 implementation may surface unforeseen Vercel quirks (edge runtime quirks for Stripe webhook, image optimization edge cases) — not blocking but trade-off recheck needed mid-port
- Launch comms placeholders may need reframing if SOTA result is partial; templates are written assuming PASS narrative dominant
- E2E test scope (15-25h) may exceed available wall-clock if Marko wants quick launch turnaround; recommend prioritization of A1+A4+A8 (representative cross-tier) for minimum viable coverage
**Mitigations baked in**:
- Apps/www brief Commit 1-11 preserve Vite scaffolding for rollback path
- Launch comms have FAIL/PARTIAL reframe options documented (template variant tone)
- E2E matrix sequencing allows partial execution (Day 1 only = 3 archetypes minimum viable)
---
## §9 PM signoff
PM (claude-opus-4-7) executed overnight per delegation. All deliverables checked into PM-Waggle-OS repo. Benchmark observed healthy. No emergencies.
Marko-vo sledeće ratifikaciono okno: 2026-04-25 ujutro.
— PM